My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Final Environmental Impact Statement Volume II Appendix K, Part 1
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Final Environmental Impact Statement Volume II Appendix K, Part 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2013 3:47:00 PM
Creation date
2/27/2013 1:09:27 PM
Metadata
Fields
Template:
Water Supply Protection
Description
related to the Platte River Endangered Species Partnership (aka Platte River Recovery Implementation Program or PRRIP)
State
NE
Basin
North Platte
Date
7/1/1998
Author
Federal Energy Regulatory Commission (FERC) Office of Hydropower Licensing
Title
Final Environmental Impact Statement (EIS) - Volume II, Appendix K, Part 1 - Kingsley Dam (FERC Project No. 1417) and North Platte/Keystone Dam (FERC Project No. 1835) Projects, Nebraska, FERC/FEIS-0063
Water Supply Pro - Doc Type
EIS
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
551
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
w <br />COMMENTS OF CENTRAL NEBRASKA PUBLIC POWER AND <br />IRRIGATION DISTRICT <br />COMMENTS OF THE <br />CENTRAL NEBRASKA PUBLIC POWER <br />AND IRRIGATION DISTRICT <br />ON THE <br />REVISED DRAFT ENVIRONMENTAL IMPACT STATEMENT <br />FOR PROJECT NO. 1417 AND <br />PROJECT NO. 1835 <br />VOLUME ADDRESSING POLICY CONCERNS AND PRINCIPAL <br />CONFLICTS IN RESOURCE UTILIZATION <br />I. INTRODUCTION <br />This volume is the first of three containing the <br />Comments of the Central Nebraska Public Power and Irrigation <br />District (Central) on the Staff's Revised Draft <br />Environmental Impact Statement (RDEIS) on Project Nos. 1417 <br />and 1835.1 The volume examines the policy concerns and key <br />issues underlying the Staff's approach to sharing scarce <br />resources among competing interests. The second volume is <br />Central's Volume of Supplemental Reports on Material Facts <br />in Dispute (Volume 2). It contains more expansive <br />discussions of crucial factual issues which influence the <br />allocation of resources. The third volume, Central's Volume <br />of Technical Analysis (Volume 3), addresses in part issues <br />1 Federal Energy Regulatory Commission (FERC), Office of <br />Hydropower Licensing, Revised Draft Environmental Impact <br />Statement. Kingsley Dam Project (FERC PrOjeCt No. 1417) and <br />North Platte /Keystone Diversion Dam Prole (FERC Project <br />No. 1835). Nebraska (Apr. 1994) ("RDBIS "). <br />Throughout these Comments, the term "Project" describes <br />Central's Project No. 1417; the term "NPPD" describes the <br />Nebraska Public Power District, licensee for Project No. <br />1835; the term "Projects" describes Project Nos. 1417 and <br />1835 collectively; and the term "Districts" describes <br />Central and NPPD collectively. <br />RESPONSES TO CENTRAL NEBRASKA PUBLIC POWER AND <br />IRRIGATION DISTRICT <br />
The URL can be used to link to this page
Your browser does not support the video tag.