My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RCC/EAC Meeting (2)
CWCB
>
Water Supply Protection
>
DayForward
>
8001-9000
>
RCC/EAC Meeting (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2017 1:37:18 PM
Creation date
2/26/2013 4:00:27 PM
Metadata
Fields
Template:
Water Supply Protection
Description
related to PRRIP
State
CO
NE
WY
Basin
South Platte
North Platte
Water Division
1
Date
11/8/2007
Author
Bureau of Reclamation
Title
Subject: RCC/EAC Meeting of November 8, 2007
Water Supply Pro - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Wyoming Area Office <br />Bureau of Reclamation <br />Page 2 of 2 <br />North Platte Pathfinder ownership (refer to NPRAOP page 3) is estimated to reach a maximum <br />ownership content of 953.1 kaf by the end of June, 62.9 kaf short of filling. <br />Assuming the Pathfinder Modification Project was in operation and a North Platte Pathfinder <br />ownership accrual of approximately 669 kaf, the Pathfinder Environmental Account would be <br />estimated to have accrued approximately 20.9 kaf and the Wyoming Municipal Account would <br />be estimated to have accrued 12.5 -kaf (approximately 3.13% and 1.87% of the 669 kaf <br />Pathfinder accrual, respectively). <br />The Glendo and Kendrick ownerships would not fill given most probable inflow conditions. <br />Should the total system inflows approach the reasonable minimum inflow conditions, the inflows <br />would be similar to those experienced in water year 2004 (661.1 kaf in water year 2004 versus <br />665.6 kaf for the 2008 minimum inflow condition). Releases from Guernsey Reservoir are in <br />response to demands in the probable operating plan. <br />Reclamation will continue to update the North Platte River operating plans on a monthly basis in <br />response to changing inflow conditions. Reclamation will prepare forecasts of the April through <br />July snowmelt runoff beginning February 1 and continuing through May 1. <br />For additional information regarding current reservoir contents and releases, please call toll free <br />1- 800 - 253 -8737 or visit our website (http: /www.usbr.gov /gp) and following the water operations <br />link for to access Reclamation's HydroMet Data system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.