My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Engineering Problems, Recreation Engineering and Planning
CWCB
>
Water Supply Protection
>
DayForward
>
8001-9000
>
Professional Engineering Problems, Recreation Engineering and Planning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2017 2:17:11 PM
Creation date
2/26/2013 11:06:14 AM
Metadata
Fields
Template:
Water Supply Protection
Description
Recreation In-Channel Diversion (RICD) Application Suuport
State
CO
Basin
Arkansas
Water Division
2
Date
6/10/2005
Author
Ms. Angeline C. Kinnaird
Title
Chaffee County's Buena Vista and Salida Boating Parks
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
informed and ask for direction when appropriate. Also responsible for guiding these projects <br />through a wide -array of public processes and approvals. Representative projects include <br />Greenways, trails of all types, whitewater boating parks, stream and river restoration, and <br />riverfront redevelopment projects. <br />1991 -1998 Boulder Greenways Coordinator <br />City of Boulder <br />Boulder, Colorado <br />Responsible for planning, coordination, management, and implementation of a comprehensive, <br />state -of- the -art greenway system designed to link virtually every major area of Boulder. The <br />award- winning project includes over forty miles of greenways, bridges and underpasses, pocket <br />parks, environmental presentation and restoration areas, and flood capacity improvements. The <br />project budget is over $1 million each year. <br />1987 -1989 Special Projects. Manager <br />City of Boulder <br />Boulder, Colorado <br />Responsible for planning, coordinating and managing a number of City projects along with <br />providing guidance and input for the preparation of city -wide master plans, annual operating and <br />capital budgets. and determination of recommended city policies. Worked closely with the City <br />Manager's office, City Attorney's office and the Parks, Planning, Open Space, and Public Works <br />Departments in a cooperative way to complete each project. Received the 1988 Boulder <br />Employee Performance Bonus Award. <br />1985 - 1989 Boulder Creek Project Coordinator <br />City of Boulder <br />Boulder, Colorado <br />Planned, coordinated, and managed $4 million stream corridor project through the City of <br />Boulder. This project won the 1986 Colorado Engineering Excellence Award, 1986 Colorado <br />Landscape Design Award, and the 1987 Best of Boulder Awards. The project has been the <br />subject of numerous articles in national magazines and at national conferences and has been <br />viewed as a state -of -the -art model for urban creek corridor projects by many U.S. cities. <br />1981 - 1982 Assistant City Engineer <br />City of Glenwood Springs <br />Glenwood Springs, Colorado <br />Responsible for handling daily emergency problems with the city water system, organizing daily <br />activities, design of capital improvement projects, and supervision of city crews. <br />-15- <br />
The URL can be used to link to this page
Your browser does not support the video tag.