Laserfiche WebLink
7. Summary 34 <br />0161 <br />Table <br />Page <br />3.1 Instrumentation options for the design phase <br />12 <br />3.2 Project design and equipment costs <br />16 <br />4.1 Project time line and 10 -yr costs <br />22 <br />4.2 Project first year operational costs <br />24 <br />4.3 Estimates of cloud treatment additional water <br />27 <br />6.1 Time Line for the Program Design Phase <br />34 <br />FIGURES <br />Figure <br />1.1 Map of the Headwaters Region of the North Platte River Basin <br />2.1 Conceptual model of orographic cloud with SLW zone and AgI seeding plume <br />4.1 Sample seeding device placement in the Headwaters Region for 240 degree winds <br />Appendix A <br />APPENDIXES <br />W1 <br />Page <br />3 <br />6 <br />26 <br />