Laserfiche WebLink
M = M = M = = <br />PROJECT TASK <br />USBR Contracting Office <br />Subtotal of Environmental and Equipment <br />Specification <br />Design and Environmental Costs <br />EQUIPMENT PURCHASE <br />Purchase of Seeding Systems <br />Seeding Generators with Auto Controls and Icing <br />Meters, Wind: Park Range <br />Seeding Generators with Auto Controls and Icing <br />Meters, Wind: Medicine Bow Range <br />Spare Parts Contingency and Backup Items <br />Subtotal for Seeding Systems Procurement <br />Seeding Effects and Weather Sensing Equipment <br />Purchase of Precipitation Gauges and DCP Systems <br />with Wind, Temp, RH, Precipitation, Solar Radiation, <br />and Icing Rate Meters <br />Computers and Communications Equipment <br />Radiometers for Detecting Cloud Water <br />Subtotal of Seeding Effects and Weather <br />Sensing Equipment <br />Total Equipment Costs <br />TABLE 3.2. - PROJECT DESIGN AND EQUIPMENT COSTS <br />10 <br />712 <br />STAFF COSTS <br />27 <br />TRAVEL COSTS EQUIPMENT AND CONTRACT COSTS <br />0 <br />594000 <br />SD <br />180 <br />Number Cost Equip & <br />712 <br />Time <br />Staff Daily <br />Total <br />TDY Total of items per Other Contract <br />638000 <br />Required <br />Days rate <br />Staff <br />Costs Travel Travel item costs Total <br />Total Task <br />Calendar <br />123200 <br />123,200 <br />Days <br />Costs <br />Days Rate Misc. <br />180 <br />30 600 <br />18000 <br />1,369,440 <br />18,000 <br />230 <br />75 2736 <br />192440 <br />45 <br />343,040 <br />70000 <br />250000 <br />264,240 <br />1,498,040 <br />180 <br />10 <br />712 <br />7120 <br />27 <br />22000 <br />0 <br />594000 <br />601,120 <br />180 <br />10 <br />712 <br />7120 <br />29 <br />22000 <br />0 <br />638000 <br />645,120 <br />123200 <br />123,200 <br />180 <br />14240 <br />1355200 <br />1,369,440 <br />180 <br />20 <br />712 <br />14240 <br />45 <br />4000 <br />70000 <br />250000 <br />264,240 <br />15 <br />712 <br />10680 <br />56 <br />500 <br />12000 <br />40000 <br />50,680 <br />90 <br />10 <br />712 <br />7120 <br />3 <br />35000 <br />5000 <br />110000 <br />117,120 <br />180 <br />32040 <br />400000 <br />432,040 <br />46280 <br />1755200 <br />1,801,480 <br />Design, Environmental and Equipment Costs $3,299,520 <br />