My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1991 North Platte Hydrology Study
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
1991 North Platte Hydrology Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2013 5:26:57 PM
Creation date
2/25/2013 2:34:02 PM
Metadata
Fields
Template:
Water Supply Protection
Description
related to the Platte River Endangered Species Partnership (aka Platte River Recovery Implementation Program or PRRIP)
State
CO
NE
WY
Basin
North Platte
Water Division
6
Date
9/28/1990
Author
U. S. Bureau of Reclamation, North Platte River Projects, Mills, WY
Title
Plan of Study for Evaluation of Operation of Existing Reclamation Projects on the Platte River for the Potential to Affect Threatened or Endangered Species
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br />0 1 ISO <br />L I <br />I 1 I <br />SCALE OF FEET <br />NORTH PLATTE <br />Intake -gate and <br />trashrock- structu <br />North Platte Project <br />00 <br />RIFER <br />r <br />o Spillway- outlettunne 'sue_ <br />\� <br />25.25 PLAN <br />N.W.S. E1.4420.0 Crest El. 4430.0 0 4f IQo <br />Rock rlprap 3:F <' El. 4390.0 SCALE OF FEET <br />8:1 <br />Ei. 4354.6 <br />Cutoff - trench Sluiced clay, sand and gravel Rockfill ' <br />Puddled clay Interbedded sand, gravel and boulders <br />MAXIMUM SECTION <br />Gatehouse Drum -gates <br />0 s0 ISO (Intake -gate) <br />i I E1. 4420.0 <br />SCALE OF FEET �i = _- _ E1. 4405.0 <br />Power - tunnel <br />/ EI.4319.0 - - - -- - - - -_ <br />Original river - diversion tunnel Sluicing - outlet Spillway- outlet tunnel <br />Settling- chamber <br />Concrete plug SOUTH SPILLWAY AND OUTLET <br />�E1.4468.0 0 +o I 1 <br />1,111 1 I <br />Gate- structure Bridge SCALE of FEET <br />I <br />N.W.S. El. 4427.75 <br />Stoney- gate <br />El. 4370.0 <br />`E 1. 4359.8 Drain <br />NORTH SPILLWAY <br />Guernsey Dam, Plan and Sections <br />El. 4355.76 <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.