TABLE 5
<br />JULESBURG RESERVOIR DAM - RESERVOIR ENLARGEMENT
<br />STUDY
<br />FEASIBILITY CONSTRUCTION COST ESTIMATE
<br />ALTERNATIVE A2 - UPGRADE EXISTING STRUCTURES
<br />MODIFIED HOMOGENEOUS EARTHFILL DAMS -
<br />TOP OF DAM
<br />ELEV. 3715.0
<br />NORMAL WATER LEVEL 3707.0, GAGE IEIGHT 24.0
<br />DAM NO. '9
<br />Unit
<br />Item Quantity Price
<br />1 Mobilization and Demobilization 1 Is $20,000.00
<br />2 Dewaizatio Operations 1 Is $20,050.00
<br />3 Strip Top Soil & Overburden 12,004 cy $2.00
<br />4 Excavate and Bac 11 Cutoff Trenoh O cy $5.00
<br />5 Slurry Cutoff Trench 103,695 fsf $6.00
<br />6 Sand FIReNDrainage Blanket 4,736 cy $20.00
<br />7 F & I Toe Drain &Fitter 3,000 tt $30.00
<br />8 Constrcwt Earthfill Embankment 36,558 cy $3.00
<br />9 Remove Existing Concrete Facing o sy $1.50
<br />10 Trim Upstream Slope 0 cy $2.00
<br />11 F & I Upstream Slope Protection Bedding O cy $0.00
<br />12 F & t Upstream Slope Protection 1,806 cy $39.00
<br />13 F & I Upstream
<br />Pin Slope 600 If $12.00
<br />14 Replace Topsoil and Seed 24,270 sy $0.75
<br />15 Excavate & Backtiill Outlet Conduct Trench 190 If $40.00
<br />16 Concrete for Outlet Works Conduit 125 cy $400.00
<br />17 F & I Secondary Outlet Pipe -ndut Steel 150 If $150.00
<br />18 Intake, Outlet Structures for Outlet Works 22 cy $400.00
<br />19 F & I Outlet Gate and Operator 1 Is $20,000.00
<br />20 Misc Steel Work - Trash Racks, Etc. 1 Is $5,000.00
<br />21 Raise Main Outlet Tower and Extend Catwalk O Is $5,000.00
<br />22 Raise 9nlet Canal Banks 0 cy $4.00
<br />23 Excavate for Inlet Canal Relocation 0 cy $2.00
<br />24 Raise Spillway Crest - Soil Cement 0 cy $40.00
<br />25 Relocate County Roads &Bridge 1 Is 60.00
<br />26 15% Miscellaneous Unscheduled Work Items 1 Is $179,400
<br />Amount
<br />$20,000
<br />$20,000
<br />$24,000
<br />$0
<br />$622,200
<br />$94,700
<br />$90,000
<br />$109,700
<br />$0
<br />$0
<br />$0
<br />$70,400
<br />$7,200
<br />$18,200
<br />$7,600
<br />$50,000
<br />$28,500
<br />$8,850
<br />$20,000
<br />$5,000
<br />$0
<br />$0
<br />$0
<br />$0
<br />$0
<br />$179,400
<br />DAM NO. 1A
<br />unit
<br />Quantity Price
<br />0 Is 9,4!00
<br />1 Is $5,000!00
<br />1,838 cy $2.00
<br />0 cy $5.00
<br />23,500 fsf $6;00
<br />966 cy $20!00
<br />700 tt $30!00
<br />5,959 cy $3:00
<br />0 sy $1.50
<br />0 cy $2.00
<br />0 cy $0!00
<br />375 cy $39700
<br />120 tt $12.017
<br />5,440 sy $0.75
<br />0 if $40!00
<br />0 cy $4017!00
<br />0 If $150!00
<br />0 cy $400!00
<br />0 Is $20,000.00
<br />O is $5,000!00
<br />0 Is $5,000.00
<br />0 cy $4.00
<br />0 cy $2.00
<br />0 cy $40.00
<br />0 Is $0!00
<br />1 Is $34,200
<br />Amount
<br />$!l
<br />$5,050
<br />$3,700
<br />$0
<br />$141,000
<br />$19,300
<br />$21,000
<br />$17,900
<br />$0
<br />$0
<br />$14,600
<br />$1,400
<br />$4,100
<br />95
<br />$o
<br />$0
<br />$0
<br />$0
<br />$0
<br />$0
<br />$0
<br />$0
<br />$o
<br />$0
<br />$34,200
<br />DAM NO. 2
<br />Unit
<br />Quantity Price
<br />1 Is $80,000.00
<br />1 Is $20,000.00
<br />6,479 cy $2.00
<br />0 cy $5.00
<br />51,478 fsf $6.00
<br />10,731 cy $20.00
<br />2,300 tt $30.00
<br />95,351 cy $3.00
<br />14,473 sy $1.50
<br />7,562 cy $2.00
<br />0 cy $0.00
<br />23,405 cy $39.00
<br />1,260 If $12.00
<br />26,010 sy $0.75
<br />0 If $40.00
<br />0 cy $400.00
<br />0 If $150.00
<br />0 cy $400.00
<br />0 Is $20,000.00
<br />O is $5,000.00
<br />0 Is $5,000.00
<br />0 cy $4.00
<br />0 cy $2.00
<br />0 cy $40.00
<br />0 Is $0.00
<br />1 Is $296,400
<br />Amount
<br />$80,000
<br />$20,000
<br />$13,000
<br />$0
<br />$308,90 0
<br />$214,600
<br />$69,000
<br />$286,100
<br />$21,700
<br />$15,100
<br />$0
<br />$912,800
<br />$15,100
<br />$19,500
<br />$0
<br />$0
<br />$0
<br />$0
<br />$0
<br />$0
<br />$0
<br />$0
<br />$0
<br />$0
<br />$o
<br />$296,400
<br />DAM N0.3
<br />Unit
<br />Quantity Price
<br />1 Is $80,000.00
<br />1 Is $10,000.50
<br />6,360 cy $2.00
<br />0 cy $5.00
<br />51,525 fsf $6.00
<br />8,535 cy $20.00
<br />1,570 If $30.00
<br />68,268 cy $3.00
<br />7,562 sy $9.50
<br />28,124 cy $2.00
<br />0 cy $0.00
<br />13,322 cy $39.00
<br />810 If $12.00
<br />15,590 sy $0.75
<br />0 If $40.00
<br />0 cy $400.00
<br />0 If $150.00
<br />0 cy $400.00
<br />0 Is $20.000.00
<br />O is $5,000.00
<br />0 Is $5,000.00
<br />0 cy $4.00
<br />0 cy $2.00
<br />0 cy $40.00
<br />0 Is $0.00
<br />1 Is $216,500
<br />Amount
<br />$80,000
<br />$10,000
<br />$12,700
<br />$0
<br />$309,200
<br />$170,700
<br />$47,100
<br />$204,800
<br />$11,300
<br />$56,200
<br />$0
<br />$519,600
<br />$5,700
<br />$11,700
<br />$0
<br />$0
<br />$0
<br />$0
<br />9A
<br />$0
<br />$0
<br />$0
<br />$0
<br />$0
<br />$0
<br />$216,500
<br />DAM NO. 4 DIKE
<br />Unit
<br />Quantity Price
<br />1 Is $30,000.00
<br />O is $10,000.00
<br />4,273 cy $2.00
<br />0 cy $5.00
<br />61,262 fsf $6.00
<br />0 cy $20.00
<br />1,800 If $30.00
<br />10,541 cy $3.00
<br />0 sy $1.50
<br />0 cy $2.00
<br />0 cy $0.00
<br />1,506 cy $39.00
<br />380 If $12.00
<br />14,240 sy $0.75
<br />0 If $40.00
<br />0 cy $400.00
<br />0 If $150.00
<br />0 cy $400.00
<br />0 Is $20,000.00
<br />O Is $5,000.00
<br />0 Is $5,000.00
<br />0 cy $4.00
<br />0 cy $2.00
<br />0 cy $40.00
<br />0 Is $0.00
<br />1 Is $84,900
<br />Amount
<br />$30,000
<br />SO
<br />$8,500
<br />s0
<br />$367,600
<br />SO
<br />$54,000
<br />$31,600
<br />so
<br />s0
<br />SO
<br />$58,700
<br />$4,600
<br />$10,700
<br />30
<br />SO
<br />s0
<br />s0
<br />SO
<br />30
<br />s0
<br />s0
<br />30
<br />s0
<br />s0
<br />$84,900
<br />DAM NO. 4
<br />Quantity
<br />0 Is
<br />O Is
<br />0 cy
<br />0 cy
<br />0 fall
<br />D cy
<br />0 If
<br />0 cy
<br />0 sy
<br />0 cy
<br />0 cy
<br />0 cy
<br />230 If
<br />0 sy
<br />0 tt
<br />0 cy
<br />0 It
<br />0 cy
<br />0 Is
<br />O Is
<br />0 Is
<br />0 cy
<br />0 cy
<br />0 cy
<br />0 Is
<br />0 Is
<br />&OUTLET WORKS
<br />Unit
<br />Price Amount
<br />$20,000.00 $0
<br />$10,000.00 $0
<br />$2.00 so
<br />$5.00 $0
<br />$6.00 $0
<br />$20.00 9A
<br />$30.00 $0
<br />$3.00 $0
<br />$1.50 $0
<br />$2.00 $0
<br />$0.00 $0
<br />$39.00 $0
<br />$12.00 $2,800
<br />9 .75 $0
<br />$40.00 $0
<br />$400.00 $0
<br />$150.00 $0
<br />$400.00 $0
<br />$$5,000.00 $0
<br />$5,000.00 910
<br />$5,000.00 $0
<br />$4.00 $0
<br />$2.00 $0
<br />$40.00 $0
<br />$0.00 $0
<br />3400 $0
<br />_ DAM NO. 5& SPILLWAY
<br />Quantity Price
<br />0 Is $30,000.00
<br />O is $10,000.00
<br />0 cy $2.00
<br />0 cy $5.00
<br />0 fsf $6.00
<br />0 cy $20.00
<br />O If $30.00
<br />0 cy $3.00
<br />0 sy $1.50
<br />0 cy $2.00
<br />0 cy $0.00
<br />0 cy $39.00
<br />0 If $12.00
<br />O sy $0.75
<br />0 tt $40'00
<br />0 cy $450.00
<br />0 If $150.00
<br />0 cy $400.00
<br />0 Is $$5,000.00
<br />O Is $5,000.00
<br />0 Is $5,000.00
<br />0 cy $4.00
<br />0 cy $2.00
<br />0 cy $40.00
<br />0 Is $0.00
<br />0 Is $0
<br />Amount
<br />$o
<br />$0
<br />$0
<br />$0
<br />$0
<br />$0
<br />s0
<br />$0
<br />s0
<br />$0
<br />$0
<br />$0
<br />SO
<br />$0
<br />$0
<br />$0
<br />$0
<br />SO
<br />$0
<br />$0
<br />$0
<br />$0
<br />$0
<br />$0
<br />$o
<br />$0
<br />INLET CANAL &ROADS
<br />Unit
<br />Quantity Price
<br />0 Is� $50,000.00
<br />O Is $20,000.00
<br />0 cy $2.00
<br />0 cy $5.00
<br />0 fsf $6.00
<br />0 cy $?0.00
<br />0 If $30.00
<br />0 cy $3'00
<br />0 sy $1.50
<br />0 cy $2.00
<br />0 cy $0.00
<br />0 cy $39.00
<br />0 It $12.00
<br />0 sy $0.75
<br />0 H $10.00
<br />0 cy $400.00
<br />0 B $150.00
<br />0 cy $400'00
<br />0 Is $20,000.00
<br />O Is $5,050.00
<br />0 Is $5,000.00
<br />0 cy $4.00
<br />0 cy $2.00
<br />0 cy $40.00
<br />0 Is $0.00
<br />0 Is $0
<br />Amount
<br />$0
<br />9A
<br />90
<br />$0
<br />$0
<br />$0
<br />s0
<br />970
<br />9A
<br />$0
<br />$0
<br />$0
<br />9A
<br />90
<br />$0
<br />$0
<br />$10
<br />910
<br />$0
<br />$0
<br />s0
<br />$0
<br />$0
<br />$0
<br />$0
<br />$0
<br />TOTAL
<br />COST
<br />$$55.000
<br />$55,000
<br />$61,900
<br />$0
<br />$1,748,900
<br />$499,300
<br />$281,100
<br />$650'100
<br />$33,000
<br />$71,300
<br />$0
<br />$1.$40,100
<br />$40,600
<br />$$7.600
<br />$7,600
<br />$50,000
<br />$28'500
<br />$8'800
<br />$$5.000
<br />$5.000
<br />$0
<br />$0
<br />$0
<br />$o
<br />$o
<br />$811,400
<br />Subtotal Dam Embankment (Items 1 -14)
<br />Subtotal Inlet and Outlet (Items 15 - 23)
<br />Subtotal Emergency Spillway (Item 24)
<br />Miscellaneous (Items 25.26)
<br />' Base Construction Costs- Subtotal
<br />Construction Contingency:
<br />' Base Construction Costs. -Total
<br />Engineering and Inspection:
<br />' Total Project Costs
<br />15.00%
<br />12.00%
<br />$1,076,400
<br />$119,900
<br />$0
<br />$179,400
<br />$1,375,700
<br />$206,400
<br />$1,582,100
<br />$189,900
<br />$1,772,000
<br />$228,000
<br />$0
<br />9:0
<br />$34,200
<br />$262,200
<br />$39,30<J
<br />$301,500
<br />$36,200
<br />$337,700
<br />$1,975,800
<br />$0
<br />9>D
<br />_ $296,400
<br />$2,272,200
<br />- $340,950
<br />$2,613,000
<br />$313,600
<br />$2,926,600
<br />$1,443,000
<br />$0
<br />00
<br />$216,500
<br />$1,659,500
<br />��
<br />-
<br />$1,908,400
<br />$229,000
<br />$2, 137, 400
<br />$565,700
<br />SO
<br />00
<br />$84,900
<br />$650,600
<br />$97,600
<br />$748,200
<br />$89,800
<br />$838,000
<br />$2,80
<br />$ $0
<br />$0
<br />00
<br />$2,800
<br />$400
<br />$3'200
<br />$400
<br />$3,600
<br />_
<br />$0
<br />$0
<br />$0
<br />$0
<br />$0
<br />$0
<br />$0
<br />so
<br />SO
<br />$0
<br />$0
<br />$0
<br />s0
<br />$0
<br />$o
<br />SO
<br />$0
<br />$0
<br />,700
<br />$ $11 9900
<br />$11
<br />$0
<br />$811,400
<br />$6,223,000
<br />$933.400
<br />$7156400
<br />15•
<br />$8.015,300
<br />
|