My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Feasibility Study, Enlargement of Julesburg Reservoir
CWCB
>
Water Supply Protection
>
DayForward
>
8001-9000
>
Feasibility Study, Enlargement of Julesburg Reservoir
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2013 11:46:28 AM
Creation date
2/20/2013 11:10:02 AM
Metadata
Fields
Template:
Water Supply Protection
Description
Logan and Sedwick Counties, Colorado
State
CO
Date
3/6/1998
Author
Narender Kumar & James Ferentchak
Water Supply Pro - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TABLE OF CONTENTS <br />(continued) <br />10.0 ADDITIONAL CONSIDERATIONS . ............................... 20 <br />10.1 Financial Feasibility ....... ............................... 20 <br />10.2 Technical Feasibility ....... ............................... 21 <br />10.3 Environmental Feasibility ............................. ...... 21 <br />10.4 Political Considerations ..................... ... ........ 21 <br />FIGURE 1 - ENLARGEMENT STUDY - FACILITIES LOCATIONS <br />FIGURE 2 - ALTERNATIVE Al, STABILIZE DAM NO.,.1 <br />FIGURE 3 - ALTERNATIVES A2, 131, Cl, C2 AND C3, RECONSTRUCT DAM NOs. 1, 1A, <br />AND 4 <br />FIGURE 4 - ALTERNATIVES A2, B1, Cl AND C2, RECONSTRUCT DAM NOs. 2 AND 3 <br />FIGURE 5 - ALTERNATIVES C2 AND C3, NEW DAM, EMBANKMENT; NOs. 1 R, 2R, 1 A -2- <br />3R, 413 AND 5 <br />TABLE 1 - RESERVOIR STORAGE CAPACITY <br />TABLE 2 - ENLARGEMENT ALTERNATIVES <br />TABLE 3 - PROJECT ALTERNATIVES COSTSUMMARY <br />TABLE 4 - ALTERNATIVE Al - STABILIZE EXISTING STRUCTURES <br />TABLE 5 ALTERNATIVE A2 - ;UPGRADE EXISTING STRUCTURES <br />TABLE 6 - ALTERNATIVE B1 - UPGRADE EXISTING STRUCTURES, NEW DAM 5 <br />TABLE 7 - ALTERNATIVE Cl - UPGRADE EXISTING STRUCTURES, NEW DAM 5 <br />TABLE '8 - ALTERNATIVE C2 NEW DAMS 2 AND 5; UPGRADE DAMS 1, 1 A, 3, 4 DIKE, <br />4 OUTLET WORKS <br />TABLE 9 - ALTERNATIVE C3 - UPGRADE DAMS 4 DIKE AND 4 OUTLET; CONSTRUCT <br />REPLACEMENT STRUCTURES 1 R, 1 A -2 -3R, AND 5 <br />2 \reports \97 -1 - 500.nk <br />
The URL can be used to link to this page
Your browser does not support the video tag.