Laserfiche WebLink
ALTERNATIVES A2, 131, C 1, AND C2 <br />RECONSTRUCT DAM NOS. 2 AND 3 <br />6" Road base \ <br />t <br />NWL -5' <br />Extend <br />2.5 Filter Blanket <br />1 <br />New fill - <br />r <br />New toe drain and r <br />filter blanket - -' Existing toe drain J� <br />and filter blanket <br />quo <br />TYPICAL SECTION <br />NOT TO SCALE <br />_ Remove <br />existing fill <br />1 (� 0 NWL <br />�_ Remove <br />�� concrete facing <br />0 G �� <br />o <br />Existing fill <br />to remain <br />New soil cement <br />slope protection <br />hi n <br />b ib <br />- g• <br />-- Slurry trench cutoff <br />into bedrock <br />FIGURE 4 <br />