Laserfiche WebLink
• <br />TABLE OF CONTENTS <br />Executive Summary <br />I. Introduction <br />A. Location <br />B. Project Scope <br />C. Project Goals <br />II. Project Parameters <br />A. <br />Site Hydrology <br />B. <br />Water Diversions/Delivery <br />C. <br />Water Deliveries to the South Platte River <br />D. <br />Water Supply <br />E. <br />Permitting Considerations <br />F. <br />Geotechnical <br />G. <br />Recharge Potential/Stream Depletion Factor Analysis <br />H. <br />Compact Call Issues <br />I. <br />Floodplain Issues <br />III. Preliminary Opinion of Probable Costs <br />IV. Conclusion and Recommendations <br />Bibliography <br />Tables <br />1— GASP Ovid Wells Technical Data <br />2 — Water Available for Diversion <br />3 — Summary of Accretions to South Platte River from Recharge at Reservoir Site <br />4 — Operation of Reservoir to Maximize Average Number of Days Call Removed <br />5 — Preliminary Opinion of Probable Costs <br />6A — Estimate of Loan Amortization and Operating Expenses <br />6B — Estimate of Loan Amortization and Operating Expenses <br />6C — Estimate of Loan Amortization and Operating Expenses <br />Figures <br />1 — Vicinity Map <br />2 — Sources of Water Supply <br />3 — Historic Effectiveness of 2,000 Acre -Feet Reservoir <br />Appendices <br />A — Geotechnical Data <br />B — Stream Depletion Analysis <br />Plates <br />I — General Plan <br />Page <br />i <br />1 <br />2 <br />2 <br />3 <br />4 <br />4 <br />4 <br />6 <br />7 <br />8 <br />11 <br />11 <br />13 <br />13 <br />16 <br />21 <br />23 <br />5 <br />9 <br />12 <br />14 <br />17 <br />18 <br />19 <br />20 <br />After 2 <br />After 6 <br />After 13 <br />Pocket <br />