My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Order Approving Stipulation
CWCB
>
Water Supply Protection
>
DayForward
>
8001-9000
>
Order Approving Stipulation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2017 12:53:23 PM
Creation date
2/19/2013 11:31:40 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
07CW137
Description
Golden RICD Diligence Stipulation - Golden and Northglen
State
CO
Basin
South Platte
Water Division
1
Date
8/6/2008
Title
Golden RICD Dilligence 07CW137
Water Supply Pro - Doc Type
Court Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
amounts claimed herein; continuation of the Clear Creek trail system along the Course <br />Extension; installation of slalom gates in the Course; hosting local, national, and international <br />boating events on the Course and Course Extension; defense of the City of Golden's water rights <br />including the Course and Course Extension rights; and defense of the Supreme Court appeal of <br />the Course and Course Extension water rights. These actions demonstrate reasonable diligence <br />with respect to the subject conditional water rights. <br />9. Decree of the Court. The foregoing paragraphs, including terms and conditions and <br />the stipulations filed in this case between the City of Golden and the CWCB, the City of <br />Northglenn, and the City of Westminster, are fully and completely incorporated into and made a <br />part of this Decree. The Court finds and orders that the City of Golden has satisfied all-necessary <br />legal prerequisites and hereby orders that (1) through reasonable diligence and application of its <br />conditional water rights to beneficial use, the City of Golden has made absolute a portion of its <br />conditional water rights for the structures constituting the Course, and maintained the remainder <br />of its conditional water rights, as set forth in Tables 5 and 6; (2) through reasonable diligence and <br />application of its conditional water rights to beneficial use, the City of Golden has made absolute <br />a portion of its conditional water rights for the structures constituting the Course Extension, and <br />maintained the remainder of its conditional water rights, as set forth in Tables 7 and 8; and (3) <br />through reasonable diligence the City of Golden has maintained its conditional water rights for <br />the 3 structures of the Course Extension not yet built. <br />An application for Sextennial Finding of Reasonable Diligence shall be filed on or before <br />the last day of 2014, if the City of Golden wishes to maintain its conditional water <br />rights, or a showing made on or before said date that the conditional rights have been made <br />absolute by completion of the appropriation. <br />It is accordingly ORDERED that this ruling shall be filed with the Water Clerk subject to <br />judicial review. <br />It is further ORDERED that a copy of this ruling shall be filed with the appropriate Division <br />Engineer and State Engineer. <br />Dated this day of 52008. <br />BY THE COURT: <br />Hon. Roger A. Klein, Water Judge <br />Water Division No. 1 <br />State of Colorado <br />24627 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.