My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Order Approving Stipulation
CWCB
>
Water Supply Protection
>
DayForward
>
8001-9000
>
Order Approving Stipulation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2017 12:53:23 PM
Creation date
2/19/2013 11:31:40 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
07CW137
Description
Golden RICD Diligence Stipulation - Golden and Northglen
State
CO
Basin
South Platte
Water Division
1
Date
8/6/2008
Title
Golden RICD Dilligence 07CW137
Water Supply Pro - Doc Type
Court Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ii. Legal Descrii3tion. The Course Extension was decreed for up to 10 structures <br />within the channel of Clear Creek in a reach beginning immediately below Structure 7 of the <br />Course, as described above at paragraph 3(A)(2), and extending approximately 2750 feet within <br />the channel of Clear Creek, terminating at a point in the SW1/4 of the SW1 /4 of Section 27, T. 3 <br />S., R. 70 W., of the 6h P.M., approximately 1,300 feet North of the South section line and 800 <br />feet East of the West section line, in Jefferson County. Since June 13, 2001, the City of Golden <br />has built 7 structures that meet the decree terms and has plans to build the remaining 3 structures. <br />The 7 structures constituting the Course Extension are located in Sections 27, 28 and 33, T. 3 S., <br />R. 70 W. of the 6"' P.M., Jefferson County, Colorado. When considering the North line of said <br />Section 33 to bear South 89'40'13 " West, the location of each structure is more specifically as <br />follows: <br />a. Structure No. 8. A structure located in the NE1 /4 of Section 33, at a point within the channel <br />of Clear Creek which bears South 86 °07`13" West, approximately 1620 feet from the NE corner <br />of said Section 33 (the Section corner common to said Sections 27, 2, and 33). <br />b. Structure No. 9. A structure located in the NE1 /4 of said Section 33, at a point within the <br />channel of Clear Creek which bears South 86 °22'24" West, approximately 1540 feet from the <br />NE corner of said Section 33 (the Section corner common to said Sections 27, 28, and 33). <br />c. Structure No. 10. A structure located in the SE1A of said Section 28, at a point within the <br />channel of Clear Creek which bears North 87 °18'58" West, approximately 1260 feet from the SE <br />corner of said Section 28 (the Section corner common to said Sections 27, 28, and 33). <br />d. Structure No. 11. A structure located in the SE1/4 of said Section 28, at a point within the <br />channel of Clear Creek which bears North 73 °50'51" West, approximately 1060 feet from the SE <br />corner of said Section 28 (the Section corner common to said Sections 27, 28, and 33). <br />e. Structure No. 12. A structure located in the SE1 /4 of said Section 28, at a point within the <br />channel of Clear Creek which bears North 50 °39'22" West, approximately 880 feet from the SE <br />corner of said Section 28 (the Section corner common to said Sections 27, 28, and 33). <br />f. Structure No. 13. A structure located in the SE1 /4 of said Section 28, at a point within the <br />channel of Clear Creek which bears North 31 155'10 " West, approximately 870 feet from the SE <br />corner of said Section 28 (the Section corner common to said Sections 27, 28, and 33). <br />g. Structure No. 14. A structure located in the SW 1/4 of said Section 27, at a point within the <br />channel of Clear Creek which bears North 01'04'11 " East, approximately 970 feet from the SW <br />comer of said Section 27 (the Section corner common to said Sections 27, 28 and 33). <br />iii. Source. Clear Creek, a tributary of the South Platte River. <br />iv. Date of Appropriation: December 30, 1998. <br />V. Amounts decreed: The following monthly flow rates in Tables 3 and 4 were <br />decreed conditional for the structures that now constitute the Course Extension: <br />24627 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.