My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150347 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150347 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2016 12:02:55 PM
Creation date
2/19/2013 10:14:39 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150347
Contractor Name
Greeley, City Of
Contract Type
Loan
Water District
3
County
Larimer
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
An emergency was determined for water quality degradation. The <br />probability of loss is Very likely and the magnitude of <br />consequence is Major. Therefore, the risk is Very High. <br />Flood Hazard <br />The flood hazard is predicted to increase dramatically within and immediately downstream of the <br />burn area. An emergency for flood hazard was determined for the following reasons: <br />• Runoff is predicted to increase significantly following the fire. <br />• There are a high number of residents and recreationists in the area resulting in high <br />numbers of people exposed. <br />• High traffic roads with drainage structures including Colorado Highway 14 and County <br />Roads 27, 52E, 25E, 44H and 63E. <br />• There is substantial risk to life and property resulting from the increased flood risk. <br />The probability of loss is Very likely and the magnitude of <br />consequence is Major. Therefore, the risk is Very High. <br />Debris Flow Hazard <br />The debris flow hazard is expected to increase significantly in the years following the fire. An <br />emergency for debris flows was determined for the following reasons: <br />• There are a high number residents and recreationists in the area resulting in high <br />numbers of people exposed. <br />• The infrastructure in the area in not adequate to handle the increases in flow and <br />sediment predicted. <br />• Debris across the roads in the area could result in large numbers of people being cut off <br />from emergency services, possibly for long periods of time. <br />• There is substantial risk to life and property resulting from the increased debris flow risk. <br />The probability of loss is Very likely and the magnitude of <br />consequence is Major. Therefore, the risk is Very High. <br />Road Washout Hazard <br />The road wash out hazard is expected to increase significantly in the near future. An emergency <br />for roads washing out was determined for the following reasons: <br />• There is substantial risk to life and property resulting from the increased debris flow risk. <br />• The current transportation system is not expected to handle the predicted flood flow <br />increases and sediment loads. <br />• Roads washing out in the area could result in large numbers of people being cut off from <br />emergency services, possibly for long periods of time. <br />The probability of loss is Very likely and the magnitude of <br />consequence is Major. Therefore, the risk is Very High. <br />High Park Fire Emergency Stabilization Plan Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.