Laserfiche WebLink
Feasibility of Replacement <br />of the <br />Twenty Two Road Lateral's Open Ditch <br />With <br />Buried PVC Pipe <br />Sponsored by the <br />Twenty Two Road Lateral Company <br />In conjunction with the <br />Colorado Water Conservation Board <br />June 2011 <br />FEASIBILITY STUDY APPROVAL <br />Pursuant to Colorado Revised Statutes 37- 60-121 &122% and <br />in accordance with policies adopted by the Board. the <br />CWCB staff has determined this Feasibility Study MOM al <br />appll le requirements for approval. 9 <br />Signed <br />