My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Artifical Recharge of Ground Water in Colorado
CWCB
>
Publications
>
DayForward
>
Artifical Recharge of Ground Water in Colorado
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2013 12:43:49 PM
Creation date
2/13/2013 2:55:34 PM
Metadata
Fields
Template:
Publications
Year
2004
Title
Artificial Recharge of Ground Water in Colorado
Author
Colorado Geological Survey Department of Natural Resources
Description
A Statewide Assessment 2004
Publications - Doc Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Artificial Recharge of Ground Water in Colorado <br />A Statewide Assessment <br />This study discusses several aspects important to the understanding of artificial recharge <br />potential in Colorado, including <br />• the various artificial recharge technologies available; <br />• the application of artificial recharge in other states and countries; <br />• the present practice of artificial recharge in Colorado; and <br />• the physical suitability of various aquifers, abandoned mines, and caves to store <br />water. <br />The suitability of an aquifer to store water is not the only consideration involved in a successful <br />artificial recharge project. Two other factors are crucial: available water supply for recharge and <br />a supportive legal policy. This report does not address either water supply or legal structure in a <br />comprehensive manner, but does touch on these factors because they bear on the implementation <br />of any potential artificial recharge project. The Colorado Water Conservation Board is in the <br />midst (2003 -04) of the Statewide Water Supply Initiative, a study that will help address both of <br />these factors. <br />Artificial recharge is most commonly implemented on a local basis, primarily by individual <br />water districts. Development of an artificial recharge project can take years to accomplish <br />between the initial concept and full -scale implementation. The process requires interdisciplinary <br />data gathering and research to determine applicability and design criteria. The American Society <br />of Civil Engineers (ASCE) recently established a set of standard guidelines to develop, operate, <br />and maintain a project for artificial recharge of ground water (ASCE, 2001). The phased <br />progression as outlined by ASCE is as follows: <br />Phase I— Preliminary activities: <br />• Data collection and organization, resource evaluation (including identification of <br />source water alternatives), alternative site evaluation, and preliminary studies; and <br />• Conceptual plan development, environmental assessment, and public involvement <br />Phase II —Field investigation and test program <br />Phase III — Design: <br />• Preliminary design, public involvement, engineering reports; and <br />• Final design, draft final report, public hearings, response to comments, and final <br />report <br />Phase IV— Construction and start up <br />Phase V— Operation, maintenance, project review, and project modification <br />Phase VI Closure <br />This study represents only the beginning of Phase I activities in this process. It includes data <br />collection and organization, alternate site evaluation, and preliminary studies on a statewide <br />basis. Not included in this investigation, yet an important part of Phase I, are evaluation of <br />potential source -water supplies, development of a detailed conceptual plan, environmental <br />assessments, and public involvement. These activities and additional data gathering are best done <br />by local entities when a specific local project is identified. The results of this study provide the <br />scientific background for the development of underground water storage in Colorado. It <br />provides the foundation for the development of a conceptual plan, site - specific field <br />investigation, and the construction of a pilot test program. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.