My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colorado Water Conservation Board Flood Protection Program
CWCB
>
Publications
>
DayForward
>
Colorado Water Conservation Board Flood Protection Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2013 1:14:48 PM
Creation date
2/8/2013 3:46:25 PM
Metadata
Fields
Template:
Publications
Year
2004
Title
Flood Protection Program
Author
Colorado Water Conservation Board
Description
Flood Protection Program Work Plan; FY 2003-2004
Publications - Doc Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is now part of Map <br />-- <br />Performance Measure <br />Prior <br />Project <br />Completion <br />Modernization and should not be a <br />ity <br />Manager <br />Date <br />separate activity <br />FEMA Map Modernization <br />Coordinate with FEMA staff in the <br />IPO <br />Brian <br />On -going <br />floodplain mapping program <br />implementation of the Map <br />BPO <br />(Tom to <br />Complete <br />Reservoir Study) <br />Modernization Business Case Plan <br />assist) <br />Colorado Watershed Protection Fund <br />selection of counties to study) <br />IPO <br />Brian <br />6 -30 -04 <br />FEMA Map Modernization Business <br />, Update and Revise Business Case <br />IPO <br />Tom <br />Annually <br />Plan updates and revisions <br />Plan annually, including study <br />(Brian to <br />Alamosa River Watershed <br />priorities, based on FEMA input and <br />IPO <br />assist) <br />6 -30 -04 <br />Restoration Master Plan <br />other factors <br />U. A1UlLl -UU V'#_ r. i aall" iu auu a s e, <br />Performance Project Description <br />-- <br />Performance Measure <br />Prior <br />Project <br />Completion <br />ity <br />Manager <br />Date <br />Willow Creek at Creede <br />Complete watershed study <br />BPO <br />Brian <br />Complete <br />North Fork of the Gunnison (Paonia <br />Completion of study <br />BPO <br />Brian <br />Complete <br />Reservoir Study) <br />Colorado Watershed Protection Fund <br />Complete development of Program <br />IPO <br />Brian <br />6 -30 -04 <br />(in conjunction with CWA) <br />Guidance and grant application forms <br />for implementation of tax checkoff <br />Alamosa River Watershed <br />Complete scope of work for <br />IPO <br />Brian <br />6 -30 -04 <br />Restoration Master Plan <br />Watershed Restoration Master Plan <br />and contract with study contractor <br />Fountain Creek Watershed GI Study <br />Finalize project scope of work and <br />IPO <br />Brian <br />6 -30 -04 <br />with PPACG and Corps <br />complete contracting process with <br />City of Colorado Springs <br />FY '03 — '04 Severance Tax Multi- <br />Finalize project Scopes of Work for <br />IPO <br />Brian <br />6 -30 -04 <br />Objective Watershed Projects <br />two watersheds, select consultant, <br />complete contracting process with <br />consultant, and coordinate with local <br />entities <br />Alamosa River restoration design <br />Oversee design and construction of <br />IPO <br />Brian <br />6 -30 -05 <br />and construction <br />CWCB - funded restoration project in <br />Capulin area <br />Colorado Watershed Protection Fund <br />Meet requirements of Colorado <br />IPO <br />Brian <br />Ongoing <br />(in conjunction with CWA) <br />Department of Revenue for annual <br />implementation of tax checkoff <br />Fountain Creek Watershed GI Study <br />Represent State interests in <br />1P0 <br />Brian <br />Ongoing <br />with PPACG and Corps <br />implementation of scope of work by <br />COE staff and selected COE <br />contractor and coordinate project <br />implementation with City of Colorado <br />S rin sand other local entities <br />Rio Grande headwaters restoration <br />Participate in the development of <br />BPO <br />an <br />Ongoing <br />project implementation <br />specific implementation projects <br />Roaring Fork River Master Plan @ <br />Project recommendation <br />IPO <br />Brian <br />On -going <br />Basalt <br />implementation <br />Recreational In Channel Diversion <br />Work with staff, consultant and Board <br />IPO <br />Tom <br />On Going <br />Policy and Criteria <br />to Develop a technical evaluation <br />procedure; foster recognized <br />professional expertise; and advise <br />supervisor of all developments <br />RICD site specific ap lications <br />Assist Director and ISF section with <br />IPO <br />Tom <br />On -Going <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.