My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colorado Water Conservation Board Flood Protection Program
CWCB
>
Publications
>
DayForward
>
Colorado Water Conservation Board Flood Protection Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2013 1:14:48 PM
Creation date
2/8/2013 3:46:25 PM
Metadata
Fields
Template:
Publications
Year
2004
Title
Flood Protection Program
Author
Colorado Water Conservation Board
Description
Flood Protection Program Work Plan; FY 2003-2004
Publications - Doc Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CU ouS h Boulder <br />Black Squirrel Creel <br />Paso County <br />FP study of various <br />Jefferson County by <br />A t F1 d Events <br />3. Prepare for and Res on o oo <br />Performance Project Description <br />manage CTP project for hydraulics <br />Priority <br />Mana <br />- <br />Completion <br />Creek Review <br />Provide project information <br />IPO <br />Larry <br />Ongoing <br />c FP study in El <br />Work with Corps and FEMA to <br />IPO <br />Tom <br />6 -30 -04 <br />non - declared events as needed) <br />produce draft FPI <br />Larry, <br />4 -30 -04 <br />As required <br />tributaries in <br />? ? ? ?? <br />IPO <br />? ? ?? <br />? ? ?? . <br />Omaha COE <br />report <br />Larry <br />6 -30 -04 <br />A t F1 d Events <br />3. Prepare for and Res on o oo <br />Performance Project Description <br />Project Measure <br />Priority <br />Mana <br />- <br />Completion <br />Implementation of project plan <br />BPO. <br />Brian <br />er <br />(Midway Project) <br />Cherry Creek Dam Safety Study <br />Document flood events (declared and <br />• Contract for as- needed <br />IPO <br />• Tom <br />1 -31 -04 <br />non - declared events as needed) <br />consulting services <br />Larry, <br />4 -30 -04 <br />As required <br />Assist with project administration <br />• Contract for annual flood <br />Joe <br />. Tom <br />Poudre River Floodway <br />Manage project and work with city <br />report <br />Larry <br />6 -30 -04 <br />• Field inspection team member <br />• All <br />• Flood documentation group <br />leader /field manager <br />• Tom <br />• Needs assessment memo after <br />event <br />• Larry <br />Flood Response Program <br />CWCB Point of contact and leader <br />IPO <br />Tom <br />On- <br />Management <br />for flood response program <br />Larry to <br />Going <br />(Assist) <br />Obtain aerial photography and or <br />Select and contract with a mapping <br />IPO <br />Tom <br />4 -30 -04 <br />mapping of flooded areas under <br />firm <br />Flood Response Program <br />Flood emergency mitigation plans <br />Select and contract consultant for <br />IPO <br />Tom <br />4 -30 -04 <br />under Flood Response Fund <br />implementation as needed <br />Evaluate CWCB designated 100 -year <br />Select and contract with a <br />IPO <br />Tom <br />6 -30 -04 <br />floodplains following flood events <br />consultant for implementation as <br />(Kevin to <br />needed <br />assist) <br />Develop flood hazard mitigation <br />Select and contract with a <br />BPO <br />Tom <br />6 -30 -04 <br />planning documents following flood <br />consultant, and prepare task orders <br />(Kevin to <br />events under Flood Response Fund <br />to complete work <br />assist <br />1999 HMGP Projects <br />Complete all project operations <br />IPO <br />Kevin <br />3 -31 -04 <br />Advance Flood Preparedness <br />Spring flood public news releases <br />IPO <br />Kevin <br />4 -1 -04 <br />Chair, Colorado Flood Task Force <br />Direct Spring and Summer mtgs. <br />IPO <br />Larry <br />4 -15 -04 <br />Assist with meeting preparation <br />JOe <br />Evaluate CWCB designated 100 -year <br />Prepare specific task orders and <br />IPO <br />Kevin <br />6 -30 -04 <br />floodplains following flood events <br />complete work <br />IPO <br />Kevin <br />On -going <br />State Hazard Mitigation Officer in <br />As- Needed <br />Federal Disaster Declarations <br />r _ __ c _W --A lt4. *.-- +- 101 nA Aa7arrle <br />4. 1Mel.UVG111 V111 "1111 lValll ".V Performance Project Project Description <br />North Fork of the Gunnison <br />Performance Measure <br />Priority <br />Project <br />Manager <br />Comp. <br />Date <br />Implementation of project plan <br />BPO. <br />Brian <br />Complete <br />(Midway Project) <br />Cherry Creek Dam Safety Study <br />Complete PMP study <br />IPO <br />Larry, <br />12 -1 -03 <br />Draft a project proposal for PMF <br />Larry, <br />4 -30 -04 <br />Assist with project administration <br />Joe <br />6 -30 -034 <br />Poudre River Floodway <br />Manage project and work with city <br />IPO <br />Larry <br />6 -30 -04 <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.