My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colorado Water Conversation Board Division of Water Resources
CWCB
>
Publications
>
DayForward
>
Colorado Water Conversation Board Division of Water Resources
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2013 1:18:26 PM
Creation date
2/8/2013 2:04:36 PM
Metadata
Fields
Template:
Publications
Year
2001
Title
South Platte Decision Support System Feasibility Study
Author
Brown and Caldwell Camp Dresser & Mckee Inc Leonard Rice Consulting Water Engneers Inc Riverside Technology, Inc
Description
South Platte Decision Support System Feasibility Study - Final Report
Publications - Doc Type
Other
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Phase 2 is expected to require approximately two years and will focus on water budget <br />modeling, consumptive use modeling, enhancements to the groundwater model for the <br />Denver Basin and Overlying Alluvium Region, and surface water modeling. This phase <br />will begin after completion of Phase 1. <br />• Phase 3, the final phase, is expected to require approximately three years and will include <br />final surface water modeling and development of a groundwater model for the Lower <br />South Platte Alluvium Region. <br />As described above, Phase 1 allows basic water resources data to be developed, reviewed and <br />disseminated to the public before any significant modeling occurs. In addition, it allows cost <br />effective water administration activities to be implemented as quickly as possible. Phases 2 and <br />3 include the addition of various modeling tools that will utilize new and existing data in order to <br />perform the complex water resource analyses identified in the Needs Assessment in Chapter 2. <br />OPERATION AND MAINTENANCE <br />Operations and maintenance is important for any decision support system to ensure continued <br />use and applicability of the decision support system. Adequate operations and maintenance of <br />the SPDSS will benefit both the State and water users by helping to ensure up -to -date databases <br />and components which are applicable to resolution of future problems. Operation and <br />maintenance costs for the SPDSS have been estimated for the period during SPDSS development <br />and the post - development period. Estimated operation and maintenance costs required during <br />system development are included in the project costs outlined above. <br />The estimated operation and maintenance costs associated with the recommended Alternative 2 <br />level of SPDSS after implementation is completed include a mixture of contract labor and three <br />full -time employees (FTEs) of the State of Colorado at an approximate cost of $420,000 per <br />year. The required full -time employees include: <br />• One water resource modeler to maintain and apply the consumptive use, water budget, <br />groundwater and surface water models. In addition this employee will be responsible for <br />conducting annual training sessions on key components of the system. <br />• One GIS and water resource modeling expert responsible for updating the irrigated <br />acreage data at a five -year frequency and assisting in the maintenance and application of <br />the consumptive use, water budget, groundwater and surface water models. <br />• One FTE responsible for (1) managing the observation and publication of the new <br />groundwater level monitoring stations, and (2) maintaining the Colorado Water <br />Administration Tool, database, network, personal computers and web site. <br />The existing operation and maintenance (O &M) programs associated with the Colorado and Rio <br />Grande decision support systems have been requested as a standard line item of the long bill <br />from the general fund. However, a legislative subcommittee has directed the operation and <br />maintenance of the existing DSS programs be paid approximately 50 percent from the general <br />fund and 50 percent from the CWCB construction fund. A request to fund 100 percent of the <br />pAdata \gen \spdss \final report \executive summary.doc E -9 <br />October 31, 2001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.