Laserfiche WebLink
OS Spill Accounting Methodology <br />12/14/97 to 4/26/98 <br />At inception of spill <br />lood Pool <br />To Be Spilled <br />3851' <br />335,693 of Permanent Pool - 7504.37 <br />Article III Accounts <br />3) Transfer To <br />Flood Pool = Offset Account <br />Physical Inflow <br />Amount Article II Accounts <br />1) Physical <br />Transit Loss: <br />Conservation Storage <br />3) Outflow <br />3851.65' <br />343,197 of <br />