Laserfiche WebLink
• <br />Project e,reence <br />facilities, expansion of existing facilities, and rehabilitation /upgrading of existing facilities, <br />as well as new facilities. Our experience in the arid Western U.S. has included pump <br />stations in desert environments with high sediment loads. See Table 3. <br />TABLE 3 - LARGE CAPACITY PUMP STATIONS DESIGNED BY BOYLE <br />Client <br />Name <br />Capacity(cfsL <br />Comments <br />Cawelo Water District <br />Pump Station A <br />165 <br />Constructed <br />Pump Station B <br />165 <br />Constructed <br />Pump Station C <br />105 <br />Constructed <br />Cross Valley Canal Participant <br />Pump Station 1 <br />736 <br />Constructed <br />Pump Station 2 <br />736 <br />Constructed <br />Pump Station 3 <br />736 <br />Constructed <br />Pump Station 4 <br />706 <br />Constructed <br />Pump Station 5 <br />706 <br />Constructed <br />Pump Station 6 <br />646 <br />Constructed <br />Pump Station 7 <br />306 <br />Constructed <br />Berrenda Mesa Water District <br />Pump Station A <br />400 <br />Constructed <br />Pump Station C <br />78 <br />Constructed <br />Belridge Water Storage District <br />Pump Station 1 -A <br />272 <br />Constructed <br />Pump Station 1 -B <br />132 <br />Constructed <br />Dallas Water Utilities <br />Southcliff Pump Station <br />227 <br />Constructed <br />City of Henderson <br />Henderson P1 Pumping Station <br />45 <br />Constructed <br />Las Vegas Valley Water District <br />Chas Heights Pump Station <br />535 <br />Under Construction <br />Las Virgenes Metropolitan <br />Water District <br />LV -2 Pump Station <br />560 <br />Constructed <br />Lost Hills Water District <br />Pump Station No. 1 <br />200 <br />Constructed <br />Pump Station No. 2 <br />45 <br />Constructed <br />Kern - Tulare Water District <br />Big Four Pump Station <br />50 <br />Constructed <br />U and I Incorporated <br />McNary 1 Pump Station <br />260 <br />Constructed <br />McNary 2 Pump Station <br />98 <br />Constructed <br />McNary 3 Pump Station <br />154 <br />Constructed <br />Westlands Water District <br />Intertie Pump Station <br />600 <br />Designed /Not <br />Constructed <br />Kern County Water Agency <br />Northwest Feeder Pump Station <br />70 <br />Under Design <br />DSWC — Devil's Lake Project <br />Round Lake Pump Station <br />100 <br />Construction Pendin <br />100 <br />Construction Pendin <br />We anticipate that the CRRP may need to quickly assess physical condition at alternative <br />P sites and determine the most cost - effective approaches to supplying pumping energy and <br />for potential non - structural water management alternatives involving existing plants. Boyle <br />has provided planning or design services on more than 30 hydropower projects in <br />31 <br />