My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colorado River Return Project
CWCB
>
Publications
>
DayForward
>
Colorado River Return Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2013 2:57:41 PM
Creation date
2/6/2013 11:59:09 AM
Metadata
Fields
Template:
Publications
Year
2002
Title
Colordao River Return Project
Author
Boyle Engineering Corporation
Description
Colorado River Return Project
Publications - Doc Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0 F30WLE <br />215 Union Blvd., Suite 500 <br />Lakewood, CO 80228 <br />TEL: (303)987 -3443 <br />FAX: (303)987 -3908 <br />www.boyleengineering.com <br />Attention: Maggie Van Cleef December 19, 2002 <br />Department of Natural Resources Purchasing Office <br />1313 Sherman Street #423 <br />Denver, CO 80203 <br />Statement of Qualifications — Colorado River Return Proiect <br />The proposed study of the Colorado River Return Project (CRRP) will document the overall <br />feasibility of many potential alternatives for our State to more fully utilize our Colorado River <br />Compact entitlements. The attached Statement of Qualifications demonstrates the ability of the <br />Boyle team to effectively work with the State on this landmark study. <br />We will identify the reasonable alternatives and quickly and concisely document the relative <br />attractiveness of wide - ranging possibilities. In particular, we will: <br />0 ■ Apply a focused approach and mobilize quickly; <br />• <br />■ Provide a complete picture of the options including structural and non - structural <br />elements; <br />■ Effectively coordinate and manage input from the State; <br />■ Produce results that are credible and defensible. <br />Like other feasibility investigations, the reliability of the conclusions is greatly affected by the <br />experience of the senior members of the evaluation team. We have, therefore, assembled an <br />efficient team with extensive water resource planning, engineering, environmental, and <br />financial assessment experience in Colorado. <br />Thank you for the opportunity to submit the attached Statement of Qualifications. We would <br />greatly appreciate the opportunity to assist the State on this project. <br />Boyle E gineering Corporation <br />Blaine N. Dwyer, PE X �� <br />Vice President - Water Resources <br />DN -B99- 197- 02 /MR/Letter BND 12- 17- 02.doe BOYLE ENGINEERING CORPORATION <br />® Reeyded Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.