My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CWCB Basin Plan Meetings 2000-2001
CWCB
>
Publications
>
DayForward
>
CWCB Basin Plan Meetings 2000-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2013 1:26:22 PM
Creation date
2/6/2013 11:38:41 AM
Metadata
Fields
Template:
Publications
Year
2001
Title
Basin Planning Meetings
Author
Colorado Water Conservation Board
Description
2000-2001 Bason Planning Meetings
Publications - Doc Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PSBR CON <br />Colorado Water <br />'r <br />Rio Grande <br />Conservation Board <br />Rod Kuharich, Director <br />c o <br />Dan McAuliffe, Deputy Director <br />3 <br />°�• •° <br />a • l.1'3 a a <br />9 <br />Basin Planning Meetings <br />www.cwcb.state.co.us <br />Policy and Planning Needs Identified by Participants <br />• Include the headwaters restoration project as part of the basin's river restoration multiobjective program <br />• Provide additional funding for river restoration programs <br />• Clarify that funds are available directly to individuals or to a group, using a District, for headgate repairs <br />• Provide education regarding water community's opposition to proposed Bureau of Land Management <br />wilderness areas <br />• Oppose changing the board membership to reflect population rather than by water basin <br />• Strong support for the development of a basin flood plan <br />• Concerns regarding New Mexico getting Colorado's water to meet water demands for the endangered <br />Silvery Minnow to develop new water storage <br />Identified Technical Assistance Needs <br />• Feasibility study and /or demonstration project for the relining of cracked concrete ditches <br />• Support demonstration grant programs <br />• Develop flood plan as part of Alamosa restoration project <br />• Support for the Colorado Decision Support System <br />• Strong support for completion of a good groundwater model in Rio Grande Decision Support System <br />• Increase coordination with Army Corps of Engineers on restoration projects <br />• Package all of the river restoration programs taking place in the basin as a statewide model of multiobjective <br />stream corridor programs with benefits for fish habitat, riparian corridors, farmer access to diversion <br />structures, bank stabilization and flood protection <br />• Request to develop a model to track water use conversion from agriculture to other uses, similar to the <br />conversion of land use <br />Identified Potential Water Projects <br />• River restoration above South Fork, in the Closed Basin and in the Conejos River Basin <br />• Headgate rehabilitation and replacement projects as identified by the Rio Grande Restoration Study <br />• Additional storage above Terrace Reservoir for multiple purposes such as flood control and storage for <br />endangered species releases <br />• Headgate repairs along Alamosa River <br />Other Issues Discussed Not Specific to the CWCB <br />• State Engineers Office requested a two -year • Concerns regarding flooding following a state - <br />extension to develop augmentation rules and ordered release from Terrace Reservoir <br />regulations due to a delay with collecting data for the • Concerns that even though the Colorado <br />RGDSS Division of Wildlife does not list a species as <br />• Technical assistance form the Water Quality Control endangered, they are required to conduct a <br />Commission in acquiring information on water recovery program if the federal government <br />quality in the basin lists the species <br />
The URL can be used to link to this page
Your browser does not support the video tag.