My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRRIP Draft Environmental Impact Statement
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
PRRIP Draft Environmental Impact Statement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2013 2:20:07 PM
Creation date
1/31/2013 5:04:09 PM
Metadata
Fields
Template:
Water Supply Protection
Description
DRAFT EIS for Platte River Recovery Implementation Program or PRRIP
State
CO
NE
WY
Basin
South Platte
Water Division
1
Date
12/1/2003
Author
U.S Department of the Interior Bureau of Reclamation U.S. Fish and Wildlife Service
Title
Platte River Recovery Implementation Program (PRRIP) Draft Environmental Impact Statement
Water Supply Pro - Doc Type
EIS
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
842
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FIGURES <br />Page <br />5 -17 <br />Example of how a river cross section could be modified by the clearing <br />and leveling of a river island ........ ............................... <br />5 -55 <br />5 -18 <br />Average open view widths at managed locations at year 13 under each <br />alternative compared with the Present Condition ........................ <br />5 -67 <br />5 -19 <br />Comparison of the mean monthly specific conductance of the South <br />Platte River at the Julesburg, Colorado, gauge for the Present <br />Condition with that of the action alternatives ........................... <br />5 -77 <br />5 -20 <br />Estimated sediment load of the North Platte and South Platte Rivers <br />near the city of North Platte, and in the Platte River at Lexington <br />and Chapman, Nebraska, for each of six alternatives ..................... <br />5 -97 <br />5 -21 <br />Comparison of least tern timing of nest initiation for the Present <br />Condition and all alternatives <br />5 <br />5 -22 <br />........ ............................... <br />Comparison of least tern nesting opportunity (lack of inundation) <br />-114 <br />for the Present Condition and all alternatives ........................... <br />5 -115 <br />5 -23 <br />Comparison of least tern (managed 1 year) elevation potential <br />(availability of nest sites) for the Present Condition and <br />all alternatives .................... ............................... <br />5 -116 <br />5 -24 <br />Comparison of least tern (unmanaged 1 year) elevation potential <br />(availability of nest sites) for the Present Condition and <br />all alternatives .................... ............................... <br />5 -117 <br />5 -25 <br />Comparison of least tern (managed 3 years) elevation potential <br />(availability of nest sites) for the Present Condition and <br />all alternatives .................... ............................... <br />5 -118 <br />5 -26 <br />Comparison of least tern (unmanaged 3 years) elevation potential <br />(availability of nest sites) for the Present Condition and <br />all alternatives .................... ............................... <br />5 -119 <br />5 -27 <br />Comparison of piping plover timing of nest initiation for the <br />Present Condition and all alternatives <br />5 <br />5 -28 <br />. ............................... <br />Comparison of piping plover nesting opportunity (lack in <br />-125 <br />inundation) for the Present Condition and all alternatives ................. <br />5 -126 <br />5 -29 <br />Comparison of piping plover (managed 1 year) sandbar (nest) <br />elevation potential (availability of nest sites) for the Present <br />5 -30 <br />Condition and all alternatives ........ ............................... <br />Comparison of piping plover (unmanaged 1 year) sandbar (nest) <br />5 -127 <br />elevation potential (availability of nest sites) for the Present <br />Condition and all alternatives <br />5 -31 <br />........ ............................... <br />Comparison of piping plover (managed 3 years) sandbar (nest) <br />5 -128 <br />potential (availability of nest sites) for the Present Condition <br />and all alternatives ................ ............................... <br />5 -129 <br />xvii <br />
The URL can be used to link to this page
Your browser does not support the video tag.