My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRRIP Draft Environmental Impact Statement
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
PRRIP Draft Environmental Impact Statement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2013 2:20:07 PM
Creation date
1/31/2013 5:04:09 PM
Metadata
Fields
Template:
Water Supply Protection
Description
DRAFT EIS for Platte River Recovery Implementation Program or PRRIP
State
CO
NE
WY
Basin
South Platte
Water Division
1
Date
12/1/2003
Author
U.S Department of the Interior Bureau of Reclamation U.S. Fish and Wildlife Service
Title
Platte River Recovery Implementation Program (PRRIP) Draft Environmental Impact Statement
Water Supply Pro - Doc Type
EIS
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
842
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TABLES <br />Page <br />4 -72 <br />State - Level, Marketing Year Crop Prices, Average for 1988 -1997 ................ <br />4 -196 <br />4 -73 <br />Annual Irrigation Deliveries Modeled by Impact Region, 48 -Year <br />Average, 1947 -1994 .................. ............................... <br />4 -197 <br />4 -74 <br />Basin Minority Populations ............... ............................... <br />4 -219 <br />4 -75 <br />Basin Poverty and Income ................ ............................... <br />4 -220 <br />5 -1 <br />Average End -of -Month Elevation (Feet) for Seminoe and Pathfinder <br />Reservoirs.......................... ............................... <br />5 -9 <br />5 -2 <br />Years With Storage Less Than Low Storage Indicator (Thousand Acre -Feet) ....... <br />5 -10 <br />5 -3 <br />Average May - August Drawdown (Feet) ..... ............................... <br />5 -11 <br />5 -4 <br />Years With Spills From Guernsey Reservoir .. ............................... <br />5 -11 <br />5 -5 <br />Percent Change in Average Seasonal Flows (Cubic Feet Per Second) <br />When Compared to the Present Condition . ............................... <br />5 -12 <br />5 -6 <br />Months With Flows Less Than 500 Cubic Feet Per Second ...................... <br />5 -13 <br />5 -7 <br />Amount of Program Water Leasing (Thousand Acre -Feet) ...................... <br />5 -15 <br />5 -8 <br />Number of Years With Irrigation Delivery Shortages .......................... <br />5 -16 <br />5 -9 <br />Average Irrigation Deliveries Shortage (Thousand Acre -Feet) ................... <br />5 -17 <br />5 -10 <br />Number of Times Water Right Administration Was Necessary on the <br />North Platte River Above Pathfinder Reservoir ............................ <br />5 -18 <br />5 -11 <br />South Platte Reservoir Storage: Average Change in End -of -Month <br />Content Relative to Historic Conditions, 1950 -1994, in Acre -Feet ............. <br />5 -19 <br />5 -12 <br />Average Gains or Losses to the South Platte River Per Month <br />(Acre -Feet) Due to Tamarack Project Operations .......................... <br />5 -20 <br />5 -13 <br />Estimated Change in Average Monthly Flows (Cubic Feet Per Second), <br />1950 -1994, Resulting From Water Leasing Operations ...................... <br />5 -21 <br />5 -14 <br />South Platte River Flow at Julesburg, Program Water for <br />Environmental Purposes (Thousand Acre -Feet) ............................ <br />5 -24 <br />5 -15 <br />Lake McConaughy: Average End -of -Month Elevation (Feet) .................... <br />5 -26 <br />5 -16 <br />Lake McConaughy Years With Storage Less Than 500,000 Acre -Feet ............. <br />5 -27 <br />5 -17 <br />Lake McConaughy May - August Drawdown (Feet) ........................... <br />5 -27 <br />5 -18 <br />Lake McConaughy Years With Spills ....... ............................... <br />5 -28 <br />5 -19 <br />Percent Change in Seasonal Average Monthly Flows (Cubic Feet <br />Per Second) When Compared to the Present Condition ...................... <br />5 -39 <br />5 -20 <br />Irrigation Deliveries: Average Monthly and Annual Flow <br />Volumes (Thousand Acre -Feet) for the Present Condition ................... <br />5 -40 <br />5 -21 <br />Irrigation Deliveries: Estimated Water Leasing (Thousand Acre -Feet) ............. <br />5 -41 <br />5 -22 <br />Shortages for the Western Canal ............ ............................... <br />5 -42 <br />5 -23 <br />Average Program Water by Basin (Thousand Acre -Feet) ....................... <br />5 -43 <br />5 -24 <br />Short- Duration High Flows Under Each Alternative ........................... <br />5 -44 <br />5 -25 <br />Central Platte Program Releases and Achievement of Target Flows ............... <br />5 -46 <br />5 -26 <br />Channel Restoration Plans ................ ............................... <br />5 -54 <br />5 -27 <br />Mean Annual Flow and the 1.5 -Year Flow for All Alternatives, <br />and Percentage Difference Relative to the Present Condition ................. <br />5 -57 <br />ix <br />
The URL can be used to link to this page
Your browser does not support the video tag.