My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Water Conservation / Supply Reconaissance Study Part 2
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Water Conservation / Supply Reconaissance Study Part 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2013 12:05:35 PM
Creation date
1/29/2013 11:55:15 AM
Metadata
Fields
Template:
Water Supply Protection
Description
Final Report - related to the Platte River Research Cooperative Agreement (aka Platte River Recovery Implementation Program or PRRIP) - Part 2
State
CO
NE
WY
Basin
South Platte
Water Division
1
Date
12/1/1999
Author
Boyle Engineering Corporation
Title
Water Conservation/Supply Reconnaissance Study for the Platte River Research Cooperative Agreement - Part 2
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
494
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TABLE S.G.80 <br />Scoring Table - With Diversions in Wyoming, Colorado, and Nebraska <br />Category 5 - Groundwater <br />Alternative- Groundwater Recharge/Return Flow Projects <br />0 0 2 <br />Legend: <br />5a: Pratt-Ferris Recharge Project: SDF = 50 Days <br />5b OF Factor = 60 Days <br />Sc : SDF Factor= 120 Days <br />5d OF Factor= 270 Days <br />7a: SDF Factor = 60 Days <br />7b : SDF Factor= 120 Days <br />7c: SDF Factor = 270 Days <br />7d; SDF Factor = 300 Days <br />7c: Beebe Draw <br />8a: SDF Factor = 60 Days <br />8b: SDF Factor = 120 Days <br />8c : SDF factor= 270 Days <br />8d: SDF Factor = 300 Days <br />8c; Badger Beaver Project <br />9a: Middle of reach, SDF Factor = 60 Days <br />9b : Middle of reach, SDF Factor= 120 Days <br />9c: Middle of reach, SDF Factor = 270 Days <br />9d: Middle of reach, SDF Factor = 300 Days <br />9e : Bottom of reach, SDF Factor = 60 Days <br />9f: Bottom of reach, SDF Factor = 120 Days <br />9g : Bottom of reach, SDF Factor = 270 Days <br />10a: SDF Factor = 60 Days <br />10b: SDF Factor = 120 Days <br />10c: SDF Factor = 270 Days <br />13a: SDF Factor = 60 Days <br />13b : SDF Factor = 120 Days <br />13c: SDF Factor = 270 Days <br />13d : SDF Factor = 300 Days <br />16: Gothenburg Canal <br />17: Dawson Canal <br />E <br />Region 1 <br />Region 2 <br />Region 3 <br />Reaches <br />Reaches <br />Reaches <br />5a <br />5b <br />Sc <br />Sd <br />7a <br />7b <br />7c <br />7d <br />7e <br />8a <br />8b <br />8c <br />Bd <br />8e <br />9a <br />96 <br />9c <br />9d <br />9e <br />9f <br />9 <br />l0a <br />lOb <br />IOc <br />13a <br />136 <br />13c <br />13d <br />16 <br />17 <br />Physical <br />Net Reduction in Shortage to Target Flows <br />0 <br />1 <br />2 <br />2 <br />2 <br />1 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />1 <br />1 <br />1 <br />Swtainability <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />2 <br />2 <br />Scalability <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />2 <br />2 <br />Technically Irrylemcmable <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />Time to Yield Realization <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />Ability to Monitor and Measure <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />Third Party Hydrologic Impacts <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />Subtotal <br />26 <br />27 <br />27 <br />27 <br />26 <br />27 <br />27 <br />27 <br />27 <br />27 <br />27 <br />27 <br />27 <br />27 <br />26 <br />22 <br />22 <br />Subtotal Average <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />3 <br />3 <br />Le allinstitutional <br />Ease of Permitting <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />Consistent with Interstate Compacts, Federal Laws & Decrees <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />Consistent with State Laws <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />Potential for Institutional Consensus <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />Can be Mitigated <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />Administrative Ease <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />Consistent with Existing Contract, Facility & Land Ownership <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />Subtotal <br />25 <br />25 <br />25 <br />25 <br />25 <br />25 <br />25 <br />25 <br />27 <br />27 <br />27 <br />27 <br />27 <br />27 <br />27 <br />27 <br />27 <br />Subtotal Average <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />Social <br />Effects on Customs and Culture <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />Equity of Impacts <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />Impacts on Community Organizations and Support Structures <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />Effects on Community Sustainability <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />Public Acceptability <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />Subtotal <br />15 <br />15 <br />15 <br />15 <br />15 <br />15 <br />15 <br />15 <br />15 <br />15 <br />15 <br />15 <br />15 <br />15 <br />15 <br />15 <br />15 <br />Subtotal Average <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />Economic <br />Initial Implementation and Capital Cost <br />5 <br />4 <br />4 <br />4 <br />5 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />Average Annual Total Cost per Acre -Foot Delivered <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />2 <br />0 <br />1 <br />1 <br />1 <br />4 <br />2 <br />2 <br />2 <br />1 <br />2 <br />2 <br />2 <br />2 <br />2 <br />3 <br />4 <br />5 <br />Direct Economic Impacts <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />Secondary Economic Impacts <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />Fiscal impacts <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />Effects on Economic Development Potential <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />Subtotal <br />19 <br />17 <br />17 <br />17 <br />21 <br />18 <br />19 <br />18 <br />17 <br />18 <br />18 <br />19 <br />19 <br />19 <br />20 <br />21 <br />22 <br />Subtotal Average <br />3 <br />3 <br />3 <br />3 <br />4 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />4 <br />4 <br />Environmental <br />Impacts to Wetlands <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />Impacts to Habitat <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />Impacts to Water Quality <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />Impacts to Prime and Unique Farmlands <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />Visual Impacts <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />Impacts to Amenities <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />Subtotal <br />22 <br />22 <br />22 <br />22 <br />22 <br />22 <br />22 <br />22 <br />22 <br />22 <br />22 <br />22 <br />22 <br />22 <br />22 <br />22 <br />22 <br />Subtotal Avero e <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />Overall Total Sum of Averages) <br />18 <br />IS <br />17 <br />17 <br />19 <br />17 <br />17 <br />17 <br />17 <br />17 <br />17 <br />IS <br />IB <br />IS <br />18 <br />17 <br />17 <br />0 0 2 <br />Legend: <br />5a: Pratt-Ferris Recharge Project: SDF = 50 Days <br />5b OF Factor = 60 Days <br />Sc : SDF Factor= 120 Days <br />5d OF Factor= 270 Days <br />7a: SDF Factor = 60 Days <br />7b : SDF Factor= 120 Days <br />7c: SDF Factor = 270 Days <br />7d; SDF Factor = 300 Days <br />7c: Beebe Draw <br />8a: SDF Factor = 60 Days <br />8b: SDF Factor = 120 Days <br />8c : SDF factor= 270 Days <br />8d: SDF Factor = 300 Days <br />8c; Badger Beaver Project <br />9a: Middle of reach, SDF Factor = 60 Days <br />9b : Middle of reach, SDF Factor= 120 Days <br />9c: Middle of reach, SDF Factor = 270 Days <br />9d: Middle of reach, SDF Factor = 300 Days <br />9e : Bottom of reach, SDF Factor = 60 Days <br />9f: Bottom of reach, SDF Factor = 120 Days <br />9g : Bottom of reach, SDF Factor = 270 Days <br />10a: SDF Factor = 60 Days <br />10b: SDF Factor = 120 Days <br />10c: SDF Factor = 270 Days <br />13a: SDF Factor = 60 Days <br />13b : SDF Factor = 120 Days <br />13c: SDF Factor = 270 Days <br />13d : SDF Factor = 300 Days <br />16: Gothenburg Canal <br />17: Dawson Canal <br />E <br />
The URL can be used to link to this page
Your browser does not support the video tag.