Laserfiche WebLink
• <br />• <br />TABLE 8.G.41 <br />COST SUMMARY <br />GROUNDWATER RECHARGE/RETURN FLOW PROJECTS IN REGION 3 <br />Note: It was assumed that wells and pumping hardware would need to be replaced after 15 years. <br />Future costs are based on an rate of 4 percent and a present day cost of $30,000. <br />8 -G -53 <br />REGION 3 <br />Gothenburg <br />Dawson <br />Groundwater <br />Groundwater <br />Groundwater <br />Canal <br />Canal <br />Pumping Projects <br />Pumping Projects <br />Canal Diversion Projects <br />Recharge Project <br />Recharge Project <br />Middle of Reach 10 <br />Middle of Reach 13 <br />Middle of Reach 13 <br />CONSTRUCTION COSTS PER <br />DIVERSION STRUCTURE OR WELL <br />Subsurface Investigations <br />3,500 <br />3,500 <br />3,500 <br />3,500 <br />3,500 <br />Diversion Structures <br />3,000 <br />3,000 <br />3,000 <br />Recharge Basins <br />6,000 <br />6,000 <br />6,000 <br />6,000 <br />6,000 <br />Measuring Devices <br />4,000 <br />4,000 <br />4,000 <br />Well Construction & Pumps <br />30,000 <br />30,000 <br />Conveyance Conduit <br />7,000 <br />7,000 <br />Power Hook -up <br />4,000 <br />4,000 <br />4000' 12" dia pipe @ $5 1ft <br />20,000 <br />20,000 <br />Replacement Costs (Well & Pump Hardware) <br />54,000 <br />54,000 <br />Total Cost per Structure or Well <br />16,500 <br />16,500 <br />124,500 <br />124,500 <br />16,500 <br />No. of structures or wells <br />1 <br />1 <br />50 <br />50 <br />50 <br />Total Construction Cost <br />16,500 <br />16,500 <br />6,225,000 <br />6,225,000 <br />825,000 <br />Engineering Fees (10 %) <br />2,000 <br />2,000 <br />623,000 <br />623,000 <br />83,000 <br />Total Construction Costs + Engineering Fees <br />18,500 <br />18,500 <br />6,848,000 <br />6,848,000 <br />908,000 <br />ANNUAL COSTS <br />Amt. Diverted <br />5,484 <br />7,475 <br />34,845 <br />29,130 <br />10,399 <br />Delivery Cost ($10 /af) <br />54,840 <br />74,750 <br />103,990 <br />Pump operation cost ($8 /af) <br />278,760 <br />233,040 <br />Annual Maintenance Costs ($300 /well) <br />15,000 <br />15,000 <br />Total Annual Cost <br />54,840 <br />74,750 <br />293,760 <br />248,040 <br />103,990 <br />No. of years <br />20 <br />20 <br />20 <br />20 <br />20 <br />Discount Rate <br />6% <br />6% <br />6% <br />6% <br />6% <br />Present Value of Annual Costs <br />629,010 <br />857,377 <br />3,369,404 <br />2,844,999 <br />1,192,757 <br />Total Capitalized Cost of Project <br />650,000 <br />880,000 <br />10,220,000 <br />9,700,000 <br />2,110,000 <br />Note: It was assumed that wells and pumping hardware would need to be replaced after 15 years. <br />Future costs are based on an rate of 4 percent and a present day cost of $30,000. <br />8 -G -53 <br />