My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Water Conservation / Supply Reconnaissance Study Part 1
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Water Conservation / Supply Reconnaissance Study Part 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2013 12:12:05 PM
Creation date
1/29/2013 11:22:05 AM
Metadata
Fields
Template:
Water Supply Protection
Description
Part 1 of Final Report for the Platte River Research Cooperative Agreement (aka Platte River Recovery Implementation Program or PRRIP)
State
CO
NE
WY
Basin
South Platte
Water Division
1
Date
12/1/1999
Author
Boyle Engineering Corporation
Title
Water Conservation/Supply Reconnaissance Study for the Platte River Research Cooperative Agreement - Part 1
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
416
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br />• <br />Table 1.3 (continued) <br />Specific and /or Representative Projects Evaluated <br />Category 5 — Groundwater <br />Groundwater Recharge /return Flow Projects <br />Pratt- Ferris Groundwater Recharge Project <br />Beebe Draw Recharge Project <br />Badger- Beaver Recharge Project <br />Groundwater Pumping Recharge Projects <br />Middle of Reach 7 (SDF =60, 120 & 270 days) <br />Middle of Reach 8 (SDF =60, 120 & 270 days) <br />Middle of Reach 9 (SDF =60, 120 & 270 days) <br />Bottom of Reach 9 (SDF =60, 120 & 270 days) <br />Middle of Reach 10 (SDF =60, 120 & 270 days) <br />Surface Water Diversion Recharge Projects <br />Middle of Reach 7 (SDF =300 days) <br />Middle of Reach 8 (SDF =300 days) <br />Middle of Reach 9 (SDF =300 days) <br />Gothenburg Canal -GW Recharge Project <br />Dawson Canal -GW Recharge Project <br />Groundwater Allocation Management and Transfer of <br />Uses <br />Reduction of Natural Groundwater Export from the <br />Basin <br />Pump up to 14,500 ac -ft from GW Mound to Platte <br />Reach 10 <br />Reach 17 <br />Reach 18 <br />Pump up to 3 6,5 00 ac -ft from GW Mound to Platte <br />Reach 10 <br />Reach 17 <br />Reach 18 <br />Pump up to 51,000 ac -ft from GW Mound to Platte <br />Reach 10 <br />Reach 17 <br />Reach 18 <br />Additional Surface Water and/or Groundwater <br />Reregulation Opportunities <br />Pump up to 14,500 ac -ft from GW to Lands <br />Previously Irrigated with Surface Water <br />Reach 17 <br />Reach 18 <br />-1 <br />Category 6 — Systems Integration and Management <br />Modification to Reservoir Operations <br />Glendo Reservoir <br />Chatfield Reservoir <br />Modification to Existing Water Rights <br />La Prele Reservoir <br />Toltec Dam and Reservoir <br />Dodge Dam and Reservoir <br />Grayrocks Reservoir <br />Transbasin Diversion\Imports <br />Middle Fork Powder River Transbasin Diversion <br />Cooper Creek Diversion <br />Wind River Transbasin Diversion <br />Category 7 - Watershed Management <br />Forest Management <br />Regional Benchmark Yield Scenario and Water Yield <br />Scenario <br />Medicine Bow National Forest Management <br />Upper South Platte River <br />Upper Cache La Poudre River <br />Upper North Platte River <br />Upper Laramie River <br />
The URL can be used to link to this page
Your browser does not support the video tag.