Laserfiche WebLink
• <br />• <br />Table 1.3 (continued) <br />Specific and /or Representative Projects Evaluated <br />Category 5 — Groundwater <br />Groundwater Recharge /return Flow Projects <br />Pratt- Ferris Groundwater Recharge Project <br />Beebe Draw Recharge Project <br />Badger- Beaver Recharge Project <br />Groundwater Pumping Recharge Projects <br />Middle of Reach 7 (SDF =60, 120 & 270 days) <br />Middle of Reach 8 (SDF =60, 120 & 270 days) <br />Middle of Reach 9 (SDF =60, 120 & 270 days) <br />Bottom of Reach 9 (SDF =60, 120 & 270 days) <br />Middle of Reach 10 (SDF =60, 120 & 270 days) <br />Surface Water Diversion Recharge Projects <br />Middle of Reach 7 (SDF =300 days) <br />Middle of Reach 8 (SDF =300 days) <br />Middle of Reach 9 (SDF =300 days) <br />Gothenburg Canal -GW Recharge Project <br />Dawson Canal -GW Recharge Project <br />Groundwater Allocation Management and Transfer of <br />Uses <br />Reduction of Natural Groundwater Export from the <br />Basin <br />Pump up to 14,500 ac -ft from GW Mound to Platte <br />Reach 10 <br />Reach 17 <br />Reach 18 <br />Pump up to 3 6,5 00 ac -ft from GW Mound to Platte <br />Reach 10 <br />Reach 17 <br />Reach 18 <br />Pump up to 51,000 ac -ft from GW Mound to Platte <br />Reach 10 <br />Reach 17 <br />Reach 18 <br />Additional Surface Water and/or Groundwater <br />Reregulation Opportunities <br />Pump up to 14,500 ac -ft from GW to Lands <br />Previously Irrigated with Surface Water <br />Reach 17 <br />Reach 18 <br />-1 <br />Category 6 — Systems Integration and Management <br />Modification to Reservoir Operations <br />Glendo Reservoir <br />Chatfield Reservoir <br />Modification to Existing Water Rights <br />La Prele Reservoir <br />Toltec Dam and Reservoir <br />Dodge Dam and Reservoir <br />Grayrocks Reservoir <br />Transbasin Diversion\Imports <br />Middle Fork Powder River Transbasin Diversion <br />Cooper Creek Diversion <br />Wind River Transbasin Diversion <br />Category 7 - Watershed Management <br />Forest Management <br />Regional Benchmark Yield Scenario and Water Yield <br />Scenario <br />Medicine Bow National Forest Management <br />Upper South Platte River <br />Upper Cache La Poudre River <br />Upper North Platte River <br />Upper Laramie River <br />