My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WAP 2001-2002 PRRIP
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
WAP 2001-2002 PRRIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2013 3:46:55 PM
Creation date
1/28/2013 2:43:42 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Staff Notebook for Platte River Research Cooperative Agreement (aka Platte River Recovery Implementation Program or PRRIP) Water Advisory Committee (WAC) Meetings including memos, comments, emails, minutes, letters, agendas, notes, etc. 2001-2002
State
CO
NE
WY
Basin
South Platte
Water Division
1
Date
1/1/2001
Author
CWCB Staff
Title
Staff Notebook for Platte River Research Cooperative Agreement Water Advisory Committee (WAC) Meetings for 2001-2002
Water Supply Pro - Doc Type
Meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
500
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br />JUL -08 -2002 MON 09;11 AM <br />FAX <br />V.3 t • J `� SAC.' 'ems <br />J o' C, e pip <br />cv it►uitions will consider tl-le effects of the Proposed Program (and other alternatives) oil all <br />ilo ;vs in the central P atle River. For comparative "scoring" purposes, the EIS evaluation will <br />trlso cstini atc, reductions iii sllortages to Progra rn target flows (species flows and annual pulso <br />flows) associated wltll 6-ach of 010 water alternatives, <br />Sirnilarly, the BO will consider the effects orthe Proposed Program on all flows. This will <br />illclalcie c onsideratiou of the Proposed Program's of <br />-relative to the Service's species flows, <br />annual pulse fYa�vs, and l�rak l�ory rcconlmendations, as the Service considers all of these flow <br />rec0mmoildfif.►o11s inlPOL -Lath to the "structure and function, patterns and processes, and habitat of <br />tl►c central 1 ?Iatte ]liver ecosystem ". <br />�2�) F�1►tul eevaluations oFPronrain betieftts. <br />As noted above, only Program larget flows (species flows and annual pulse flows) have been <br />LlSod as t.11c b;tsis for: <br />8 Calcultitltlticy "historic shortages to target flows "; <br />• 139teblishing replacenmeiit obligations for projects covered by state and federal Future <br />depletion plaits; <br />• Rcconnaissailcalovcl 011aluatioris of potential Program flow augmentation projects <br />(Boyle's "Water coils orvation/Supply Study"); and <br />• "Scoring" tho Proposed Program and alternatives relative to Service goals. <br />Nevertheless, peak' flow rcconlrrlendations are identified as the highest priority in the suite of � <br />low recommendations established by FWS for the central Platte River, and thus also will be <br />Mlluitted in (errns of'Progmn-i benefits for the target species. It remains an objective of tlie� <br />ticrvicc to (1) mfiiiil1ife reductions in the frequency and magnitude or the highest peal. flows and <br />(2) ii- 11prove the long -term running average annual peak flow m agaitt►des in the central Plalte <br />I bcc;wse tho Service considers peak flows an essential al factor iti conser i hE:- :cosystemti <br />Lipon whicli the listed species and other species defend, Future evaluations Of the Prograin will <br />rogi►irc a Balanced assessinellt of the positive effects on species and annual pulse flows versus the <br />ill'4;;ItlVl 001octs 011 peak flows. I <br />�V <br />1 <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.