My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GC 2010 PRRIP
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
GC 2010 PRRIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2013 11:55:32 AM
Creation date
1/25/2013 4:59:45 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Platte River Recovery Implementation Program (PRRIP) Governance Committee (GC) Meeting agendas, contracts, emails, budgets, related reports, minutes, notes, etc. 2010
State
CO
NE
WY
Basin
South Platte
Water Division
1
Date
1/1/2010
Author
Platte River Recovery Implementation Program (PRRIP)
Title
Platte River Recovery Implementation Program (PRRIP) Governance Committee (GC) Meeting documents for 2010
Water Supply Pro - Doc Type
Meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. PRRIP — ED OFFICE DRAFT 12/0712009 <br />87 Finance Committee (FQ <br />88 Purcell provided an update on the latest FC activities. The FC met on November 9 and discussed <br />89 the FY 2010 Program budget. The FC recommended several changes and Kenny was directed to <br />90 make those changes and present the revised budget to the GC for approval. The FC reviewed the <br />91 wet meadows information review RFP and the 1 -D modeling RFP. <br />92 <br />93 Program Outreach Update <br />94 Recent Presentations: <br />95 • Program was very involved in the Platte River Symposium, including coordinating two <br />96 keynote panel discussions (Kenny, Schellpeper, Anderson, Czaplewski, Jenniges; ISAC <br />97 members); ED Office staff led a field trip to Cottonwood Ranch; UNL staff said it was one of <br />98 the most well attended events they have hosted. <br />99 • Ron Bishop presented at the American Water Resources Association in Texas in November. <br />100 <br />101 Upcoming Presentations: <br />102 • Smith is presenting to the 70th Annual Midwest Fish and Wildlife Conference in Springfield, <br />103 IL on December 7. <br />104 • ED Office will host a meet and greet for anchor point landowners in Kearney on December <br />105 10 to discuss geomorphology /vegetation monitoring efforts during the summer of 2009. <br />106 <br />107 Press Coverage: <br />108 • Kearney Hub featured a large piece on the Program and Cottonwood Ranch related to the <br />109 Platte River Symposium. <br />110 • Kenny was interviewed for Kearney Hub story on the Platte River caddisfly. <br />111 <br />112 Barron presented Christmas gifts from Headwaters Corporation to all GC members. <br />113 <br />114 FY 2010 Program Budget, Work Plan, and ED Office Contract <br />115 Kenny discussed the latest versions of the FY 2010 Program Budget, Work Plan, and ED Office <br />116 contract. With the exception of line item ED -1, all budget line items and associated numbers <br />117 have been previously presented to the GC and have been discussed in detail with the WAC, <br />118 LAC, TAC, and FC. The FC directed Kenny to reduce the number for ED -1 by at least 3.5 %. <br />119 Kenny reduced the number by 3.6% and the total is now under $1.6 million; background <br />120 information is contained in Exhibit B, the ED Office Contract amendment for 2010. The budget <br />121 out to 2019 does not indicate an ED Office budget increase. <br />122 <br />123 Two numbers need to be revised based on late- breaking information: <br />124 <br />125 • PS -2, Lower Platte River Stage Change Study— This report was to be presented to the GC in <br />126 December but has been pushed back to March 2010 because of additional analysis, meetings, <br />127 and discussion to wrap the project up. Kenny asked for a new money allocation of $50,000 <br />128 for FY 2010. <br />This document is a draft based on one person's notes of the meeting. The official meeting minutes may be different if corrections are <br />made by the Governance Committee before approval. <br />PRRIP GC Meeting Minutes Page 3 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.