My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GC 2010 PRRIP
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
GC 2010 PRRIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2013 11:55:32 AM
Creation date
1/25/2013 4:59:45 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Platte River Recovery Implementation Program (PRRIP) Governance Committee (GC) Meeting agendas, contracts, emails, budgets, related reports, minutes, notes, etc. 2010
State
CO
NE
WY
Basin
South Platte
Water Division
1
Date
1/1/2010
Author
Platte River Recovery Implementation Program (PRRIP)
Title
Platte River Recovery Implementation Program (PRRIP) Governance Committee (GC) Meeting documents for 2010
Water Supply Pro - Doc Type
Meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br />... <br />ASSOCIATES <br />N6�1 <br />arrange for performance by persons other than the prime contractor and those services <br />necessary to administer Client's contract(s). <br />2.2.9 Services in connection with staking out the work of Contractor(s). <br />2.2.10 Services during out -of -town travel other than visits to the site. <br />2.2.11 Preparation of operating and maintenance manuals to supplement Basic Services. <br />2.2.12 Services to redesign some or all of the Project. <br />2.2.13 Preparing to serve or serving as a consultant or witness or assisting Client with any <br />litigation, arbitration or other legal or administrative proceeding except where required as part of <br />Basic Services. <br />2.3 When required by the Agreement or Contract Documents in circumstances beyond <br />Olsson's control, Olsson shall perform or obtain from others any of the following Additional <br />Services as circumstances require during construction and without waiting for specific <br />instructions from Client, and Olsson will be paid therefore as provided in the Letter Agreement: <br />2.3.1 Services in connection with work directive changes and change orders to reflect the <br />changes requested by Client if the resulting change in compensation for Basic Services is not <br />commensurate with the additional services rendered. <br />2.3.2 Services in making revisions to Drawings and Specifications occasioned by the <br />acceptance of substitutions proposed by Contractor(s); services after the award of each contract <br />in evaluating and determining the acceptability of an unreasonable or excessive number of <br />substitutions proposed by Contractor; and evaluating an unreasonable or extensive number of <br />claims submitted by Contractor(s) or others in connection with the work. <br />2.3.3 Services resulting from significant delays, changes or price increases occurring as a <br />direct or indirect result of material, equipment or energy shortages. <br />2.3.4 Additional or extended services during construction made necessary by (1) work <br />damage by fire or other causes during construction, (2) a significant amount of defective, <br />inefficient or neglected work by any Contractor, (3) acceleration of the progress schedule <br />involving services beyond normal working hours, (4) default by any Contractor. <br />SECTION 3— CLIENT'S RESPONSIBILITIES <br />3.1. Client shall provide all criteria and full information as to Client's requirements for the <br />Project; designate and identify in writing a person to act with authority on Client's behalf in <br />respect of all aspects of the Project; examine and respond promptly to Olsson's submissions; <br />and give prompt written notice to Olsson whenever Client observes or otherwise becomes <br />aware of any defect in the Olsson's service. <br />Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.