My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRRIP Late 2007 to 2008
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
PRRIP Late 2007 to 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2013 11:37:57 AM
Creation date
1/25/2013 1:49:40 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Platte River Recovery Implementation Program (PRRIP) Various Documents from 2007 to 2008 including reports, studies, RFPs, proposals, budgets, Governance Committee (GC) meeting documents, and emails.
State
CO
NE
WY
Basin
South Platte
Water Division
1
Date
1/1/2007
Author
Platte River Recovery Implementation Program (PRRIP)
Title
Platte River Recovery Implementation Program (PRRIP) Various Documents from 2007 to 2008 and emails.
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
736
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
P� <br />PRRIP — ED OFFICE DRAFT <br />.......... ...____ ........... _.__ ._....._____ <br />01/30/2008 ._._._... <br />The GC would receive a draft report from Boyle on the Water Management Study in January and <br />then would have time to provide comments and review the draft. The postponed Water <br />Management Study workshop would be held on the afternoon of Wednesday, February 13 in <br />Kearney. After that, final comments would be due to Boyle quickly so they could finalize the <br />Phase I report. <br />Kraus asked Butler if the Service is targeting March 2008 as the preferred time for the pulse flow <br />release. Butler said yes, assuming all factors in place like insurance, the EA bypass agreement <br />signed, and other necessary authorizations. Kraus asked about the status of pulse flow <br />a4oaitoring Smilb said the. eurrent direction is to us monitoring on water tracking and <br />hydrology as opposed to monitoring like vegetation and geomorphology. Butler said there is <br />discussion underway about where the water will come from and how to move it through the <br />system, and whether any diversions will be made at that time. Mike Drain said he was not sure <br />there are 4,000 acre -feet of available storage, but rather 4,000 acre -feet of available capacity. <br />That will influence the borrow /payback issues. Brian Barels said the bypass agreement needed <br />to be finalized and signed in order to move ahead. Butler said the federal authorization needs to <br />be passed, and the insurance issue needs resolved. <br />Meeting adjourned. <br />This document is a draft based on one person's notes of the meeting. The official meeting minutes may be different <br />if corrections are made by the Governance Committee before approval. Page 7 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.