My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRRIP Late 2007 to 2008
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
PRRIP Late 2007 to 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2013 11:37:57 AM
Creation date
1/25/2013 1:49:40 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Platte River Recovery Implementation Program (PRRIP) Various Documents from 2007 to 2008 including reports, studies, RFPs, proposals, budgets, Governance Committee (GC) meeting documents, and emails.
State
CO
NE
WY
Basin
South Platte
Water Division
1
Date
1/1/2007
Author
Platte River Recovery Implementation Program (PRRIP)
Title
Platte River Recovery Implementation Program (PRRIP) Various Documents from 2007 to 2008 and emails.
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
736
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Labor Estimate for Phase II Whooping Crane Analysis <br />219 transects <br />73 sites <br />Assume 75 sites Assume 3 surveyed transects per site <br />225 transects <br />18.75 days to enter transect data into HECRAS at 12 transects per d. <br />89 sitings that require flow input data but used the same locations as the <br />(Some of these sitings may be on the same day, so there could be /e <br />DAYS TASK NO TASK DESCRIPTION <br />INPUT <br />1 Enter transect data into HECRAS for 75 sites <br />19 la Convert processed survey transect data to cross section <br />Enter obstruction locations in cross sections? (May be an <br />Assumption- Siting is in main channel unless Shay instruc <br />Assumption- 10 percent or less of the sitings will be chan <br />2 1 b 7 sites will not be in the main channel and may need extra <br />1 1 c Get 75 USGS mean daily flow values for siting days and <br />Assumption- Shay will provide dates and times of whoopi <br />1 1 d Get 89, or less, USGS mean daily flow values for siting d; <br />1 1e Match /organize cross sections in HECRAS for 89 sites. <br />The original estimate was based on labor to input and run HECRAS. Data u <br />and as HECRAS plots of cross sections. Because of the large quantity of o <br />Shay and I also discussed labor for Reclamation to extract specific WC dai <br />and Task 3 is new. <br />DAYS TASK NO TASK DESCRIPTION <br />OUTPUT <br />2 Processing and Reporting Data from HECRAS output on <br />Assumption- Deliverable is a table (spreadsheet table unl <br />3 variables per transect, 3 transects per WC siting, and 1 <br />Every WC siting is associated with: date of WC siting anc <br />Assumption- The 3 variables are: <br />change in WS elevation from transect survey <br />wetted top width of transect channel on WC s <br />hydraulic depth (flow area of main channel dig <br />2 2a Download into spreadsheet water surface elevations on d <br />2 2b Download into spreadsheet wetted width of main channel <br />using cross section output, check that water surface widtl <br />2 2c Download into spreadsheet average depth of transect on <br />3 Processing HECRAS data on all cross sections <br />between Overton and Chapmen in the Platte River HECF <br />The model has approximately 900 cross sections and inte <br />[Data may be provided as a separate run /output table for <br />
The URL can be used to link to this page
Your browser does not support the video tag.