Laserfiche WebLink
Project Cost Estimate <br />Estimated project construction costs are itemized in Table 2. The cost to complete the Tamarack Project, as <br />described in the Final Environmental Assessment, is estimated to be $1,895,000. This estimate includes a nominal <br />allowance of 5 percent for additional engineering (such as may be required for supplemental investigations in <br />connection with the infiltration gallery design and intermittent engineering and inspection services during <br />construction) and a contingency of 15 percent. <br />- 5 - 13OVLLE <br />