My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Final Environmental Assessment for the Tamarack Managed Groundwater Recharge Project
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Final Environmental Assessment for the Tamarack Managed Groundwater Recharge Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2013 3:46:54 PM
Creation date
1/24/2013 11:12:40 AM
Metadata
Fields
Template:
Water Supply Protection
Description
relates to the Platte River Endangered Species Partnership (aka Platte River Recovery Implementation Program or PRRIP)
State
CO
Basin
South Platte
Water Division
1
Date
8/3/1999
Author
Colorado Division of Wildlife
Title
Final Environmental Assessment (EA) fo rteh Tamarack Managed Groundwater Recharge Project at Tamarack Ranch State Wildlife Area and Pony Express State Area
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CULTURAL RESOURCES <br />Archeological investigations have been conducted. A copy of the State Historical <br />Preservation Officer clearance of the archeological investigation is include in Appendix F. <br />There are no archeologically significant sites that will be impacted by the development of <br />the Tamarack Plan on TRSWA or PESWA. The archeological survey did not include sites <br />within the 100 year floodplain because these sites were deemed to have been previously <br />disturbed. There are 24 well sites and approximately 2.49 miles of pipeline located within <br />the 100 year floodplain. <br />LAND USE <br />The project is consistent with the current and future management plans of both SWAB. <br />Unique Farmland investigations have been conducted. A copy of the NRCS clearance for <br />prime and unique farmlands is included in Appendix D. There are no unique or Prime <br />farmlands that will be impacted by the development of the Tamarack Plan on TRSWA or <br />PESWA. <br />FLOOD PLAINS AND WETLANDS <br />Temporary berming at the well construction sites will create a potential reduction in the <br />floodplain width near the well sites of approximately 100 feet which represents less than <br />1% impact to the floodplain width. This temporary impact is deemed a negligible impact <br />on the floodplain function. <br />There will be some impact to the wetlands on the PESWA by the construction of a pipeline <br />from the proposed well to the proposed recharge pond. The COE office determined that <br />the proposed pipeline construction could be authorized pursuant the Department of the <br />Army Nationwide Permit No. 18. See Appendix E. <br />VI. CONSULTATION AND COORDINATION <br />Jon Altenhofen, with the SPLRG, provided project maps. <br />Terry McKee, with the Army Corp of Engineers, reviewed project sites for wetland issues <br />and clearances for 404 permit. <br />Dawn Jackson and Cynthia Gilmore, from the Sterling and Sedgwick County NRCS offices <br />respectively, reviewed project sites for unique and prime farmland clearances. <br />Janice McKee, with the USFWS was consulted regarding T &E species. <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.