My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRRIP Draft Environmental Impact Statement Summary
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
PRRIP Draft Environmental Impact Statement Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2013 5:33:01 PM
Creation date
1/23/2013 4:32:23 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Summary of Platte River Recovery Implementation Program (PRRIP) Draft Environmental Impact Statement (EIS) Assessing Alternatives for Implementation of a Basinwide, Cooperative, Endangered Species Recovery Program
State
CO
NE
WY
Basin
South Platte
Water Division
1
Date
12/1/2003
Author
Bureau of Reclamation and U.S. Fish and Wildlife Service
Title
Summary of Platte River Recovery Implementation Program (PRRIP) Draft Environmental Impact Statement (EIS)
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Table E -15.— Summary Table of Estimated Land Cover Changes for All Land Parcels <br />Managed in the Wet Meadow Alternative <br />E -67 <br />Table E -16.— Average Annual Program Water (Acre -Feet Per Year) Contribution to <br />Species' Target Flows Under the Water Emphasis Alternative <br />E -68 <br />Table E -17.— Illustrative Distribution of Water Leased to the Program Under the <br />Water Emphasis Alternative <br />E -70 <br />Table E -18.— Illustrative Distribution of Program Lands, by River Reach, for the <br />Water Emphasis Alternative <br />E -72 <br />Table E -19.— Summary Table of Estimated Land Cover Changes for All Land Parcels <br />Managed in the Water Emphasis Alternative <br />E -73 <br />Table E-20.—Geographic Markers for the Central Platte River <br />E -78 <br />Table E -21.— Primary Project Costs E -98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.