Laserfiche WebLink
Summary <br />Summary of Impacts of Each Alternative Compared to the Present Condition <br />(Impacts are quantified on an annual basis, unless otherwise noted) <br />Alternatives <br />Resources, <br />Governance <br />Governance <br />Water <br />Wet <br />Water <br />Significant Indicators, and <br />Geographic Areas <br />Committee <br />Committee , <br />Leasing <br />Meadow <br />Emphasis <br />Scenario 1 <br />Scenario 2 <br />Central Platte Basin <br />Lake McConaughy <br />Subject to new exposure or erosion at low water. <br />Central Platte Offstream <br />Construction would cause extensive <br />Regulatory Storage Reservoir <br />ground disturbance. <br />No impact <br />Land acquisition and <br />management in the Central <br />May include physical modifications or ground disturbance. <br />Platte Habitat Area <br />Construction of <br />Groundwater management in <br />new wells, well <br />the Central Platte groundwater <br />Construction of new wells, well pads, <br />pads, and <br />mound <br />and pipelines expected to disturb <br />No impact <br />pipelines <br />localized areas <br />expected to <br />disturb <br />localized areas <br />Laying <br />Riverside drains <br />Laying underground <br />No impact <br />underground <br />piping may affect resources <br />piping may <br />affect resources <br />