My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board Meeting
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Board Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2013 1:20:11 PM
Creation date
1/22/2013 12:59:35 PM
Metadata
Fields
Template:
Water Supply Protection
Description
January 28-29,2013 Board Meeting Agenda
Date
1/29/2013
Water Supply Pro - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BUDGET <br />Provide a detailed budget by task including number of hours and rates for labor and unit cents for other direct costs (i.e. mileage, $/unit of <br />material for construction, etc.). A detailed and perfectly balanced budget that shows all costs is required for the State's contracting and purchase <br />order processes. Sample budget tables are provided below. Please note that these budget tables are examples and will need to be adapted to fit <br />each individual application. Tasks should correspond to the tasks described above. <br />Engineer's detailed Probable Opinion of Cost is attached as Exhibit B. Once construction contract is <br />awarded, a revised budget will be provided to the State. <br />Total Gore Canyon Whitewater Park at <br />Costs Pump House <br />Matching <br />Funds <br />Direct Costs <br />(If <br />Total Project <br />Applicable) <br />Costs <br />Prior <br />*RICD Legal, Engineering, <br />$495,414 <br />$495,414 <br />tasks <br />Coordination, etc. Not included in <br />calculations for match or total project <br />costs. Less than $40,000 has been spent <br />in past 9 months. Required minimum <br />match is exceeded. <br />Task I <br />Final Design/ Specifications/Bid <br />$40,000 <br />$40,000 <br />acka e <br />Task 2 <br />Coordination /Outreach <br />$40,000 <br />$40,000 <br />Task 3 <br />Signage <br />$15,000 <br />$15,000 <br />Task 4 <br />Permitting <br />$5,000 <br />$15,000 <br />$20,000 <br />Task 5 <br />Construction* <br />$455,000 <br />$440,700 <br />$895,700 <br />Task 6 <br />Upland site improvements if any per <br />$501000 <br />$50,000 <br />BLM <br />Task 7 <br />Benches, viewing area, parking <br />$80,000 <br />$80,000 <br />improvements if any per BLM <br />Task 8 <br />50 Years OMRRR <br />$50,000 <br />$50,000 <br />Total <br />$500,000 <br />$690,700 <br />$1,190,700 <br />Costs: <br />* Costs incurred to bring project to this <br />point —not all eligible for match as they <br />happened over 8 years. * *Construction <br />detail on attached budget spreadsheets <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.