Laserfiche WebLink
Water Supply Reserve Account — Application Form Grand County Revised Aug 30, 2012 <br />Revised December 2011 Gore Canyon Whitewater Park at Puraphouse <br />expressed interest in supporting the construction phase of the project. <br />e. Grand County, the project sponsor, is contributing the remaining matching funds of 3S% of the total cost to <br />complete construction of the features at Pumphouse. Funds from the Colorado Basin Account exceed the <br />minimum required ratio of Basin to Statewide funds, while funds from Grand County exceed the minimum <br />required ration of Basin to Project Sponsor funds. <br />TIER 3: ADDRESSES OTHER ISSUES OF STATEWIDE VALUE AND MAXIMIZES BENEFITS <br />• <br />Part IV. ® Required Supporting Material <br />I Water Rights, Availability, and Sustainability — This information is needed to assess the viability of the <br />water project or activity. Please provide a description of the water supply source to be utilized, or the water <br />body to be affected by, the water activity. This should include a description of applicable water rights, and <br />water rights issues, and the name/location of water bodies affected by the water activity. <br />Water is still available for future development above and below this site. <br />2. Please provide a brief narrative of any related studies or permitting issues. <br />There are several studies related to the recreational needs of this reach of the Colorado River that will be met by <br />the construction of the Gore Canyon Whitewater Park. The Colorado Basin Roundtable's Non-Consumptive <br />9 <br />