Laserfiche WebLink
F. Actual construction as called for in the design documents and in change orders <br />approved by the CWCB and the BORROWER. <br />G. Engineering services for construction management, including design and <br />construction management for CWCB- approved change orders. <br />H. Interest during completion of the PROJECT pursuant to Paragraph A.2 herein. <br />I. Legal services for reviewing engineering services contracts, reviewing this contract, <br />reviewing construction contract documents, and for complying with all federal, state, <br />and local regulatory requirements. <br />SECTION 8 - DISBURSEMENT SCHEDULE <br />The BORROWER shall prepare a periodic progress report which contains a statement <br />of the PROJECT costs expended for that period and shall forward said statement to <br />the CWCB. After receipt of the periodic progress report from the BORROWER, and <br />review and acceptance of the items therein as eligible expenses as described below, <br />the CWCB will pay to the BORROWER the amount set forth in the report or such <br />portion that has been approved by CB. Such payment shall be made within <br />thirty (30) days from the CWCB's � W, I of rogress report. <br />SECTION 9- TIME FOR PERFORMANCE <br />Project Beginning: Upon effect) datfcontract <br />Project Finish: Two years from th cf a date of this contract <br />SECTION 10 — Additional Contract Rements <br />No other additional contract requirements. <br />