My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153330 PIF Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C153330 PIF Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2013 10:41:00 AM
Creation date
1/22/2013 9:29:17 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153330
Contractor Name
Upper Yampa Water Conservancy District
Contract Type
Loan
Water District
58
County
Garfield
Routt
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Form 6-AC-02A DE MENT OR AGENCY NUMBER <br />« 34 -04 -00 <br />CONTRACT,ROU TCIN NUMBER <br />$979,725.00 <br />CONTRACT <br />THIS CONTRACT, made this 1St day of,.._ July 1979, by and between the <br />State of Colorado for the use and benefit of the Department of '1 Natural Resources <br />Colorado Water Conservation Board) <br />hereinafter referred to as the State, and 'Z _Upper Yampa Water Conservancy District, <br />hereinafter referred to as the contractor <br />WHEREAS, authority exists in the Law and Funds have been budgeted, appropriated and otherwise made <br />available and a sufficient unencumbered balance thereof remains available for payment in Fund Number 40 08 , <br />G/L Account Number -7147, Contract Encumbrance NumberC-12 ; and <br />17140 77- 77 -AM/7,?7 <br />WHEREAS, required approval, clearance and coordination has been accomplished from and with appropriate <br />agencies; and <br />WHEREAS, `3pursuant to Title 37, Article 60, Colorado Revised <br />Statutes 1973, as amended, the State, through the Colorado Water <br />Conservation Board, may construct water resource,,projects and make <br />the waters available therefrom to the 'der�f the State of <br />Colorado upon conditions to be determvi by h' Colorado Water <br />Conservation Board; and ,u'.•�f" <br />WHEREAS, the Contractor is a Wa`'7 Wrvancy District in the <br />State of Colorado and wishes to undi' ke construction of a dam <br />hereinafter called the project for the m Xs of the Upper Yampa <br />Water Conservancy District in Garfield Colorado, at an <br />estimated cost of Four Million Seven Hun „ od Twenty -Five Thousand <br />Dollars ($4,725,000); and <br />WHEREAS, a feasibility investigation of said project was conducted <br />and it was found that such a project is economically feasible; and <br />WHEREAS, the State, through the Colorado Water Conservation Board, <br />has agreed to construct said project and to sell the same to the <br />Contractor upon mutually agreeable terms and conditions, subject to <br />the approval of appropriations for that purpose by the Colorado General <br />Assembly and the Governor of the State of Colorado; and <br />WHEREAS, pursuant to Senate Bill No. 35, Fifty -First General <br />Assembly of the State of Colorado, duly eTiac.ted by the Colorado General <br />Assembly and approved by the Governor of the State of Colorado, there <br />was, appropriated to the Colorado Water Conservation Board the sum of <br />One Million Dollars ($1,000,000) for construction of the Yamcolo <br />Project; and <br />WHEREAS, the, Contractor has available from its own sources and <br />from a loan approved by the Farmers Home Administration sufficient funds <br />to construct the remainder of the project; <br />NOW THEREFORE, in consideration of the mutual and dependent <br />covenants herein contained, it is agreed by the parties hereto as <br />follows: <br />A. The Contractor agrees that it will: <br />1. Cause the construction of said project to be completed within <br />two (2) years of the date of this contract in accordance with the project <br />plans and specifications and any necessary modification thereof approved <br />by the State. No payment will be made under this contract until the <br />project plans and specifications are approved by the State. The above - <br />mentioned time may be extended by the State if such time is insufficient <br />Page 1 ofd_ pages <br />*(See instructions on reverse of last page.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.