My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153670B PIF Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C153670B PIF Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2013 10:43:24 AM
Creation date
1/22/2013 9:29:13 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150670B
Contractor Name
Ute Water Conservancy District
Contract Type
Loan
Water District
72
County
Mesa
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. 1 <br />UW -94 -07 <br />AMENDED RESOLUTION <br />The Board of Directors ( "Board ") of the Ute Water Conservancy <br />District ( "District ") , and of the Ute Water Activity Enterprise <br />( "Enterprise ") , at a regular meeting held on November 9, 1994, <br />adopts the following Resolution: <br />RECITALS <br />A. The District is a water conservancy district in the State <br />of Colorado. It has established and it owns the Enterprise, which <br />is a water activity enterprise as defined by §37- 45.1- 102(4), <br />C.R.S., and which is an enterprise for purposes of Article X, <br />Section 20 of the Colorado Constitution. <br />B. The District is the owner of a pipeline which runs from <br />its sources of water supply in the Plateau Creek Basin to its water <br />treatment plant near Palisade ( "The Plateau Creek Pipeline "). The <br />Plateau Creek Pipeline is used to transport raw water from the <br />sources of supply to the District's water treatment plant for <br />treatment and subsequent distrib n to the District's customers. <br />The District has owned and ope he Plateau Creek Pipeline for <br />many years. <br />C. The population wi n tct is expanding and the <br />demand for water to serve the increasing. In order to <br />provide an adequate suppl to meet the demands of the <br />customers of the District„ tt% Enterprise, and to improve the <br />reliability of the water s m of the District and the Enterprise, <br />the District and Enterprise have determined that it is necessary to <br />upgrade and /or replace The Plateau Creek Pipeline. Without such <br />upgrading and replacement, The Plateau Creek Pipeline will soon be <br />inadequate to serve the needs of the public. Therefore, the <br />District and the Enterprise have determined that it is necessary to <br />upgrade and /or replace The Plateau Creek Pipeline in order to <br />fulfill the needs of the District and Enterprise and their <br />customers. <br />D. Thus, the Board hereby determines that the interest of <br />the District and the Enterprise, and the public interest and <br />necessity, demand that The Plateau Creek Pipeline be replaced <br />and /or upgraded, and that provision be made for paying the cost of <br />such replacement and upgrading. <br />E. The District and the Enterprise desire to obtain a loan <br />from the Colorado Water Conservation Board ("CWCB") for the purpose <br />of designing and constructing the replacement and /or upgrading of <br />The Plateau Creek Pipeline (the "Project "). <br />F. CWCB has been authorized to loan up to the amount of <br />$7,537,500 to the District for the Project. <br />APPENDIX B <br />
The URL can be used to link to this page
Your browser does not support the video tag.