My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Draft Technical Memorandum
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Draft Technical Memorandum
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2013 2:11:22 PM
Creation date
1/17/2013 1:17:56 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Prepared for States of Colorado, Nebraska, and Wyoming related to Platte River Endangered Species Partnership (aka Platte River Recovery Implementation Program or PRRIP)
State
CO
WY
NE
Basin
South Platte
Water Division
1
Date
2/6/2002
Author
Parsons Engineering Science, Inc. Simons & Associates, Carter Johnson
Title
Draft Technical Memoranda - Platte River Channel Dynamics Investigations
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PARSONS <br />Parsons Engineering Science, Inc. • A Unit of Parsons Infrastructure & ? chnology,:Group Inc. <br />1760 Broadway. Suite 900 Denver. Coll r do ii:u!(, - (303) 831 -8100 - Fix (3Q3183]- :8208. • Ir�rsons.com <br />February 6, .2002 <br />Ann Bleed <br />Nebraska Department of Water Resources <br />301 Centennial Mall South <br />P.O. Box 94676 <br />Lincoln, NE 68509 -4676 <br />Subject: Platte River Channel Dynamics Study 739921 <br />Dear Ann: <br />This is to provide you the notebook containing the technical memoranda as described in <br />the project scope. By copy of this letter, I am also delivering copies to Rick-Brown, Mike <br />Besson and Mike Purcell. <br />The deliverable also contains the E -1 and E -2 sections. These sections.. provide an <br />analysis of the hypotheses and proposed actions of the original EIS "White Paper" and <br />relate any significance of the technical studies relative to the Papers' content, Therefore, <br />this document is complete and final pending the review. <br />I will follow up with you in a few days to determine the schedule relative to the review <br />process and how that impacts other related issues. <br />Please feel free to call Gary Lewis or me with any questions you might have., <br />Sin rely; <br />Dougla Meurer <br />Engineering /Environmental Manager <br />PARSONS <br />CC: Rick Brown, Mike Besson, Mike Purcell <br />LED <br />
The URL can be used to link to this page
Your browser does not support the video tag.