AYRES ASSOCIATES INC
<br />q,a tI o p , .o og:, , ng' H
<br />Hof c ugh
<br />a iB S
<br />� u
<br />... r -,µ 1�,.; P
<br />PM i „i +
<br />+pk
<br />S`�'ent ear To. /
<br />/0 CUI7I late, s
<br />;,,> v f
<br />�_._.._...9..».r..��., -...0 .
<br />.�-.,..._.9 J
<br />err "
<br />Meet with ED Office to Finalize Year 2 Monitoring Plan and Discuss $1,944 $
<br />$346.87 $
<br />$562.92 $
<br />$1,944.00 1
<br />100.00%
<br />Landowner /Access Issues
<br />2 O
<br />Obtain, Prep, and Mobilize Project Equipment $
<br />$3,927 $
<br />$726.65 $
<br />$179.97 $
<br />$1,133.28 2
<br />28.86%
<br />Conduct Cross Section Surveys of Active Channel Topography and Geomorphology
<br />3 a
<br />and Surveys of In- Channel Vegetation Belt Transects and Related Topography at $
<br />$203,078 $
<br />$804.39 $
<br />$1,692.39 $
<br />$2,841.52 1
<br />1.40%
<br />25 Anchor Points (29 sites)
<br />Bed and Bar Material Sampling of Cross Sections at Anchor Points (284 samples), $
<br />$25,859 $
<br />$0.00 $
<br />$0.00 $
<br />$0.00 0
<br />0.00%
<br />4 B
<br />Compare with Year 1 and 2 data.
<br />Survey Data Reduction, Update and Merge LiDAR Data with Ground Survey Data; $
<br />$26,233 $
<br />$1,062.46 $
<br />$277.33 $
<br />$1,339.79 5
<br />5.11%
<br />5 S
<br />Vegetation Data Analysis
<br />Conduct 6 Bedload Samplings, 1 Depth- Integrated Suspended Sediment Sampling,
<br />6 a
<br />and 1 Bed Material Sample at 5 Bridge Locations in Year 3, Perform Total Load $
<br />$53,851 $
<br />$13,003.55 $
<br />$530.67 $
<br />$27,922.48 5
<br />51.85%
<br />Computations, Compare with Year 1 and 2 Data
<br />Compile Topographic, Geomorphic, Vegetation, and Sediment Data in GIS $
<br />$14,261 $
<br />$0.00 $
<br />$760.67 $
<br />$1,840.53 1
<br />12.91%
<br />7 C
<br />Database
<br />Meet With ED Office and TAC to Discuss Results of Year 3 Effort, Draft and Final $
<br />$11,037 $
<br />$0.00 $
<br />$0.00 $
<br />$0.00 0
<br />0.00%
<br />8 M
<br />Summary Report on Year 3 Data Collection Efforts and Monitoring Activities
<br />9 D
<br />Development of Year 4 Monitoring Plan and Budget (If Approved) $
<br />$2,835 $
<br />$0.00 $
<br />$0.00 $
<br />$0.00 0
<br />0.00%
<br />Year 3 Project Management and Coordination, Conduct Project QA/QC, $
<br />$4,475 $
<br />$1,081.72 $
<br />$503.85 $
<br />$2,792.20 6
<br />62.40%
<br />10 Y
<br />Administration
<br />Total Budget $
<br />$347,500 1
<br />1 $17,025.64 $
<br />$4,507.80 $
<br />$39,813.80 1
<br />11.46%
<br />MINI y�'� f f
<br />�' ,... Mt" �s ih 8
<br />i....,'..°`n *.....,. ,v.�:, caw..,.�csa ae,.aaswxfie.v.,_
<br />eve op an atlas displaying the results ot the tirst (ZMJ) and second year o
<br />River the Channel Geomorphology and In- Channel Vegetation Monitoring of the Central $25,000.00 $3,714.43 $0.00 $23,750.00 95.00%
<br />Atlas Platte River
<br />Y ....,., !., r� ., . .., µc gin% .l^rh +. .� 5F a^:A,suh'l,y� ib IVt : R oral esss 8� d;d.ltional�Analisl �y,��
<br />P ofe��o a e es hro ' h,„ �y
<br />..War..u.s�1� a..a...w..u.h:.+.J,ar� »..,. usl .. 'Jo<:�+.,wrf! r,yy ' •'..+u h.utw ....,r.sa.a32>:.'arb Mstaa a� tin�i4�„W;�rts.d,.m. OV.uw,tiar.b'L,zd
<br />AMP Additional data analysis tasks and participation in the 2011 and 2012 AMP
<br />Reporting Reporting Sessions and July 2011 Elm Creek Complex ISAC workshop $75,000.00 $4,573.21 $0.00 $20,362.25 27.15%
<br />Session
<br />`Includes Olsson Associates Costs
<br />
|