Laserfiche WebLink
EA Project No: 1482201 <br />EA Engineering, Science, and Technology, Inc. Page 2 of 3 <br />Task 005 — Pilot -Scale Demonstration Project Design <br />• Continued design activities. <br />• Participated in weekly design coordination meetings. <br />• Submitted Draft Design Memorandum on 25 May 2011 to ED Office. <br />• Notified of potential 7.7 Site and 27 May 2011 and incorporated this site into design. <br />• Submitted Final Design Memorandum on 31 May 2011. <br />Task 006 — Groundwater and Surface Water Interaction <br />• Continued data evaluation. <br />• Developed spreadsheet templates for evaluated water level data for drains and recorders <br />Task 007 — Additional Data Collection <br />• Prepared, submitted, and received approval for the Fieldwork Plan Addendum 1. <br />• Ordered equipment for additional drain monitoring <br />• Prepared equipment for installation <br />Work Projected Next Reporting Period <br />Task 0002 — Project Management and Meetings <br />• Continue conducting various informal meetings and phone calls. <br />Task 005— Pilot -Scale Demonstration Project Design <br />• Conduct review meeting for Final Design Memo with Work Group, scheduled for 3 June <br />2011. <br />• Continue design activities. <br />• Conduct a conference call at about 50% design with ED office. <br />• Coordinate with CNPPID. <br />Task 006— Groundwater and Surface Water Interaction <br />• Downloading of water level recorders and data evaluation. <br />Task 007 — Additional Data Collection <br />• Install additional drain staff gauges, conduct flow measurement, and install water level <br />recorders, anticipated for early June <br />• Complete supplemental survey <br />Task 008 — Investigate 7.7 Site <br />• Discuss possible investigation activities at the 7.7 Site. <br />• If authorized, prepare Fieldwork Plan Addendum 2 and conduct investigation on <br />accelerated schedule. <br />Nebraska Groundwater Recharge Feasibility Study Progress Report <br />