Laserfiche WebLink
OLS O <br />Ra_ ASSOCIATES <br />Summary <br />This status report covers work from December 31, 2011 through February 4, <br />2012. Below are the major items that have been worked on since the previous <br />status report: <br />Task 3.0 Feasibility Level Design <br />• Refined design and supporting figures, cost estimates, etc. for draft <br />feasibility report <br />Task 4.0 Finalize Feasibility Report <br />Prepared draft feasibility report <br />Upcoming Work Schedule <br />• Draft feasibility report was submitted February 15, 2012. <br />• Address comments on draft feasibility report. <br />