My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRRIP 2012 Invoices (2)
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
PRRIP 2012 Invoices (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2013 11:12:13 AM
Creation date
1/16/2013 2:38:50 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Platte River Recovery Implementation Program (PRRIP) Invoices for 2012 - Volume 2
State
CO
NE
WY
Basin
South Platte
Water Division
1
Date
1/1/2012
Author
Platte River Recovery Implementation Program (PRRIP)
Title
Platte River Recovery Implementation Program (PRRIP) Invoices for 2012 - Volume 2
Water Supply Pro - Doc Type
Budget
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
570
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7 Mav 2012 <br />PLATTE RIVER RECOVERY IMPLEMENTATION PROGRAM <br />Custom Database and Web Site Development, Hosting and <br />/Maintenance, 2012 <br />APRIL 2012 Progress Report <br />The following work was performed by April 27 "i, 2012: <br />1 Hosting, Support, and Maintenance <br />1.1 Operational Support <br />Provided technical support to end users as needed. <br />Made requested modifications to protocol datasheets. <br />Continuing to monitor database performance. No issues have been encountered since the updates <br />were made to the database configuration. <br />Tightened firewall security to reduce unauthorized login attempts from abroad. <br />Reviewed and monitored server performance. <br />2 System Development/Enhancements <br />2.1 SharePoint Upgrade - 5 % <br />Nothing performed in April. This task will fully commence in May. <br />2.2 F1owLink Migration - 80% <br />Worked on database transfer scripts to prepare for cut -over to production system. <br />2.3 SSL Security Implementation -10% <br />Nothing performed in March. <br />2.4 Progress Tracking Application <br />No activity. Scheduled for Sept /Oct. <br />2.5 SDIt Conversion - 99% <br />The SDR has been updated to allow operations on the data through the U1. Phase I of the OPDB <br />application is complete and has been deployed to PRRIP: <br />llttp: / /www t)latteriverprogram orb/ intranet/ PrograinData /SDRDataManagemenUQAQC.,,t for <br />testing by David, Megan, Justin, and Gary as they are able. A copy of the live data is being used for <br />this test phase. <br />Included in this phaseare the change requests made by Megan earlier this year. The changes have <br />been applied to the InfoPath forms and to the OPDB application. Another set of requests came in <br />from Megan last week for changes /additions to the InfoPath forms - these will get reviewed and <br />incorporated into a Phase II release of the OPDB application, which will also include an additional <br />Nest filter, ID search box to locate records quickly, and any other suggestions that have been <br />approved. <br />Progress Report April 2012 1 - R I V E R S I D E <br />
The URL can be used to link to this page
Your browser does not support the video tag.