Laserfiche WebLink
t 1 f$/r68 fir °r /a r YV s"�#Aclf <br />Q -1 <br />LF -4 --? 5l� <br />0 <br />TO: Mr. Steve Smith <br />Platte River Recovery Implementation Program (PRRIP) <br />FROM: Dan Bigbee, EA Engineering, Science, and Technology, Inc. (EA) <br />COPY: File <br />RE: Progress Report -- Water Quality Monitoring <br />EA# 1482202 <br />DATE: 10 April 2012 <br />TIME PERIOD: 05 — 31 March 2011 <br />This progress report describes the project effort for the above time period. <br />Work Completed This Period: <br />• Initiated the preparation of Platte River Water Quality protocol addendum and the <br />Kearney Canal Water Quality protocol addendum. <br />• Initiated the preparation of the Annual Monitoring Plan. <br />• Completed sampling of bacteria in the Platte River on March 1, 2012, March 7, 2012, and <br />March 14, 2012. <br />Work Projected Next Reporting Period <br />• Finalize the protocol addendums and Annual Monitoring Plan. <br />Schedule <br />The project is on schedule. <br />