My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRRIP 2012 Invoices
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
PRRIP 2012 Invoices
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2013 11:11:01 AM
Creation date
1/16/2013 1:49:57 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Platte River Recovery Implementation Program (PRRIP) Invoices for 2012 - Volume 1
State
CO
NE
WY
Basin
South Platte
Water Division
1
Date
1/1/2012
Author
Platte River Recovery Implementation Program (PRRIP)
Title
Platte River Recovery Implementation Program (PRRIP) Invoices for 2012 - Volume 1
Water Supply Pro - Doc Type
Budget
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
687
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
T <br />6 April 2012 . <br />PLATTE RIVER RECOVERY IMPLEMENTATION PROGRAM <br />Custom Database and Web Site Development, Hosting and <br />Maintenance, 2012 <br />MARCH 2012 Progress Report <br />The following work was performed b) March 30`x'. 2012: <br />1 Hosting, Support, and Maintenanc. <br />1.1 Operational Support <br />Provided technical support to end users as needed. <br />Made requested modifications to protocol datasheets. <br />Continued to monitor database performance. Change log file recovery to "simple" which reduced <br />storage requirements and rate of growth of log files. This change does not impact recovery <br />capabilities. <br />Tightened firewall security to reduce unauthorized login attempts from abroad. <br />Reviewed and monitored server performance. <br />2 System Development/Enhancements <br />2.1 SharePoint Upgrade — 5 % <br />Nothing performed in March. <br />2.2 FlowLink Migration — 80% <br />Installed F1owLink on production VM. Had Isco provide additional floating license to support move <br />to new server. Copied existing database to production server. Next step is to schedule a time to <br />reconfigure the destination that the gages send data to. This requires a trip out to the gages. <br />2.3 SSL Security Implementation —10 % <br />Nothing performed in March. <br />2.4 Progress Tracking Application <br />No activity. Scheduled for Sept/Oct. <br />2.5 SDR Conversion — 90% <br />Operational interface has been implemented and presented to Justin and David. Feedback was <br />provided and is currently being implemented. This task will be complete in April. <br />3 Project Management <br />Project management tasks were performed as needed. <br />Progress Report March 2012 <br />1 <br />'` RIVERSIDE <br />
The URL can be used to link to this page
Your browser does not support the video tag.