Laserfiche WebLink
v <br />MEMORANDUM <br />TO: Ms. Beorn Courtney <br />Platte River Recovery Implementation Program (PRRIP) <br />FROM: Dale Schlautman, EA Engineering, Science, and Technology, Inc. (EA) <br />COPY: File <br />RE: Progress Report — Nebraska Groundwater Recharge Feasibility Study <br />EA# 1482201 <br />DATE: 20 April 2012 <br />TIME PERIOD: 1 March 2012 — 3 I March 2012 <br />This progress report describes the project effort for the above time period. <br />Work Completed This Period: <br />Task 0002 — Project Management and Meetings <br />• Conducted various informal phone calls and provided progress report. <br />Task 008 — Installation of Instrumentation (Pilot Project) <br />• On -site observation during well abandonment of the piezometer. <br />• Receipt of subcontractor invoices. <br />• Task complete. <br />Task 009 — Construction Phase Services and Operational Support (Pilot Project) <br />• Coordination with EDO, CNP PID and Contractor during site restoration activities. <br />• Task complete. <br />Task 010 — Collection of Instrumentation Data <br />• Conducted final download in early March. <br />• Delivered salvaged equipment to the ED Office with a summary letter. <br />• Task complete. <br />Task 011 — Evaluation and Reporting (Pilot Project) <br />• Continued data evaluation and report preparation. <br />Nebraska Groundwater Recharge Feasibilit,v Study Progress Report <br />