My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRRIP 2012 Invoices
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
PRRIP 2012 Invoices
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2013 11:11:01 AM
Creation date
1/16/2013 1:49:57 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Platte River Recovery Implementation Program (PRRIP) Invoices for 2012 - Volume 1
State
CO
NE
WY
Basin
South Platte
Water Division
1
Date
1/1/2012
Author
Platte River Recovery Implementation Program (PRRIP)
Title
Platte River Recovery Implementation Program (PRRIP) Invoices for 2012 - Volume 1
Water Supply Pro - Doc Type
Budget
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
687
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
v <br />MEMORANDUM <br />TO: Ms. Beorn Courtney <br />Platte River Recovery Implementation Program (PRRIP) <br />FROM: Dale Schlautman, EA Engineering, Science, and Technology, Inc. (EA) <br />COPY: File <br />RE: Progress Report — Nebraska Groundwater Recharge Feasibility Study <br />EA# 1482201 <br />DATE: 20 April 2012 <br />TIME PERIOD: 1 March 2012 — 3 I March 2012 <br />This progress report describes the project effort for the above time period. <br />Work Completed This Period: <br />Task 0002 — Project Management and Meetings <br />• Conducted various informal phone calls and provided progress report. <br />Task 008 — Installation of Instrumentation (Pilot Project) <br />• On -site observation during well abandonment of the piezometer. <br />• Receipt of subcontractor invoices. <br />• Task complete. <br />Task 009 — Construction Phase Services and Operational Support (Pilot Project) <br />• Coordination with EDO, CNP PID and Contractor during site restoration activities. <br />• Task complete. <br />Task 010 — Collection of Instrumentation Data <br />• Conducted final download in early March. <br />• Delivered salvaged equipment to the ED Office with a summary letter. <br />• Task complete. <br />Task 011 — Evaluation and Reporting (Pilot Project) <br />• Continued data evaluation and report preparation. <br />Nebraska Groundwater Recharge Feasibilit,v Study Progress Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.