My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRRIP 2010 Invoices (2)
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
PRRIP 2010 Invoices (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2013 11:06:30 AM
Creation date
1/16/2013 11:29:10 AM
Metadata
Fields
Template:
Water Supply Protection
Description
Platte River Recovery Implementation Program (PRRIP) Invoices for 2010 - Volume 3
State
CO
NE
WY
Basin
South Platte
Water Division
1
Date
1/1/2010
Author
Platte River Recovery Implementation Program (PRRIP)
Title
Platte River Recovery Implementation Program (PRRIP) Invoices for 2010 - Volume 3
Water Supply Pro - Doc Type
Budget
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
595
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SCHEMMER <br />ARCHITECTS i ENGINEERS j PLANNERS L.P -5 <br />June 15, 2010 <br />Jason Farnsworth <br />Natural Resource Specialist <br />Headwaters Corporation <br />4111 4th Avenue, Suite 6 <br />Kearney, NE 68845 <br />RE: Progress Report, Cottonwood Ranch Bridge Project <br />TSA Project No. 05779001 <br />Dear Jason: <br />During May 2010, the Schemmer Associates: <br />❑ Completed and submitted the Corps of Engineer's 404 permit application; <br />❑ Mailed agency review letters to the Nebraska tribes and SHPO; <br />❑ Discussed the project with the NDEQ; <br />❑ Incorporated responses from the NRCS, NeSHPO and the Ponca Tribe into <br />the NEPA documentation; <br />❑ Modified the roadway alignment south of the channel to avoid the fenced -off <br />area used by NPPD; <br />❑ Submitted the preliminary plans for review; <br />❑ Prepared the final hydraulic report; <br />❑ Began to develop the concrete headwall and wingwall design drawings; <br />❑ Developed specifications for the erosion control over the roadway; <br />❑ Began to develop the front -end documents for bidding purposes. <br />During June 2010, we will: <br />❑ Finalize the plans and contract documents. <br />Please call if you have any questions regarding the attached invoice. <br />Sincerely, <br />THE SCHEMMER ASSOCIATES INC. <br />ARCHITECTS I ENGINEERS I PLANNERS <br />/j <br />Doug Holle, P.E. <br />Manager, Roadway Design <br />Enclosure <br />PHONE 402.493.4800 <br />FAx 402.493.7951 <br />1044 North 115th Street, Suite 300 <br />Omaha, Nebraska 68154 -4436 <br />EPAPLOYEE OWNED <br />SCHEMMER.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.